PlannedKittedPCB assemblyFinal assemblyBurn-in & testQC & packComplete
Rev C Late — due 30 Oct 2026 Traveller Kit list — BOM rev C × 10Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-POE sub-assy Enclosure kit, rugged PoE | K5-01 | 1 ea | 10 | 3 | Issued |
| PSA-POE sub-assy Power PCBA, rugged PoE | K2-04 | 2 ea | 20 | 7 | Issued |
| J-M12-4 M12 4-pin panel connector | D2-04 | 1 ea | 10 | 78 | Issued |
| P-CTN-S Carton small, printed | H1-01 | 1 ea | 10 | 280 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 10 | 247 | Issued |
Serials & test records (0)
Serial numbers are minted when the build is completed, each with its burn-in and test record.
Works order
- Builds
- RPOE-4P-48
- Quantity
- 10
- Stage
- Final assembly
- For
- SO-26-0304Kestrel Defence Systems
- Released
- 01 Oct 2026
- Due
- 30 Oct 2026
- Assigned
- Grace O'Brien
- Build time
- 5 h (30 min each)
- Std cost
- $265.80 each · $2,658.00
Build documentsAll →
DWG-RPOE-4P-48
Assembly drawing
C ReleasedBOM-RPOE-4P-48
Bill of materials
C ReleasedTP-RPOE-4P-48
Test procedure
B Released