Kit list — BOM rev C × 3Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBP2 sub-assy Enclosure kit, GBP2 | K5-08 | 1 ea | 3 | 39 | Issued |
| HAR-GBP2 sub-assy Output harness, GBP2 | K4-02 | 1 ea | 3 | 41 | Issued |
| PSA-WIC sub-assy Power PCBA, wide-input DC charger | K2-06 | 1 ea | 3 | 3 | Issued |
| P-CTN-M Carton medium, printed | H1-02 | 1 ea | 3 | 482 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 3 | 247 | Issued |
Serials & test records (3)All →
First unit KT26-15401 · tested by Josh Mitchell on 31 Aug 2026
Input
24 VDC
Output @ 100%
10.02 V
Efficiency
90.2%
Ripple
35 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15401 | C | 10.02 V | 90.2% | 35 mV | Pass | Shipped |
| KT26-15402 | C | 9.99 V | 90.9% | 51 mV | Pass | Shipped |
| KT26-15403 | C | 10.01 V | 91.2% | 40 mV | Pass | Shipped |
Works order
- Builds
- WIC-24-10
- Quantity
- 3 · 3 built
- Stage
- Complete
- For
- SO-26-0278Ironbark Mine Automation
- Released
- 27 Jul 2026
- Due
- 07 Sep 2026
- Completed
- 31 Aug 2026
- Assigned
- Andrew Costa
- Build time
- 1.3 h (25 min each)
- Std cost
- $195.89 each · $587.67
Build documentsAll →
DWG-WIC-24-10
Assembly drawing
C ReleasedBOM-WIC-24-10
Bill of materials
C ReleasedTP-WIC-24-10
Test procedure
B Released