Kit list — BOM rev C × 51Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBX sub-assy Enclosure kit, GBX | K5-03 | 1 ea | 51 | 77 | Issued |
| PSA-GBX60 sub-assy Power stage PCBA, GBX 60W | K2-09 | 1 ea | 51 | 34 | Issued |
| J-PC5-2 Terminal block 2-pos 5.08mm | D2-01 | 2 ea | 102 | 311 | Issued |
| P-CTN-S Carton small, printed | H1-01 | 1 ea | 51 | 280 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 51 | 247 | Issued |
Serials & test records (51)All →
First unit KT26-15541 · tested by Tom Barker on 14 Sep 2026
Input
48 VDC
Output @ 100%
24.02 V
Efficiency
88.3%
Ripple
61 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15541 | C | 24.02 V | 88.3% | 61 mV | Pass | Shipped |
| KT26-15542 | C | 24.04 V | 89.5% | 19 mV | Pass | Shipped |
| KT26-15543 | C | 23.99 V | 88.6% | 20 mV | Pass | Shipped |
| KT26-15544 | C | 24.00 V | 87.9% | 33 mV | Pass | Shipped |
| KT26-15545 | C | 23.97 V | 88.4% | 40 mV | Pass | Shipped |
| KT26-15546 | C | 23.97 V | 89.4% | 41 mV | Pass | Shipped |
| KT26-15547 | C | 24.02 V | 88.6% | 51 mV | Pass | Shipped |
| KT26-15548 | C | 24.03 V | 87.4% | 41 mV | Pass | Shipped |
| KT26-15549 | C | 23.95 V | 89.6% | 18 mV | Pass | Shipped |
| KT26-15550 | C | 23.99 V | 87% | 51 mV | Pass | Shipped |
| KT26-15551 | C | 24.00 V | 89.6% | 56 mV | Pass | Shipped |
| KT26-15552 | C | 24.02 V | 89% | 56 mV | Pass | Shipped |
| KT26-15553 | C | 24.03 V | 89.6% | 24 mV | Pass | Shipped |
| KT26-15554 | C | 24.01 V | 87.3% | 40 mV | Pass | Shipped |
| KT26-15555 | C | 24.03 V | 88.5% | 44 mV | Pass | Shipped |
| KT26-15556 | C | 23.97 V | 89.6% | 34 mV | Pass | Shipped |
| KT26-15557 | C | 23.99 V | 87.4% | 51 mV | Pass | Shipped |
| KT26-15558 | C | 24.03 V | 87% | 55 mV | Pass | Shipped |
| KT26-15559 | C | 24.01 V | 90% | 30 mV | Pass | Shipped |
| KT26-15560 | C | 24.03 V | 87.5% | 62 mV | Pass | Shipped |
| KT26-15561 | C | 23.97 V | 88% | 23 mV | Pass | Shipped |
| KT26-15562 | C | 23.96 V | 89.2% | 25 mV | Repaired | Shipped |
| KT26-15563 | C | 23.96 V | 89.2% | 59 mV | Pass | Shipped |
| KT26-15564 | C | 24.01 V | 87.9% | 42 mV | Pass | Shipped |
| KT26-15565 | C | 24.03 V | 88.2% | 23 mV | Pass | Shipped |
| KT26-15566 | C | 24.02 V | 89.4% | 36 mV | Pass | Shipped |
| KT26-15567 | C | 24.03 V | 88.9% | 25 mV | Pass | Shipped |
| KT26-15568 | C | 24.01 V | 90% | 20 mV | Pass | Shipped |
| KT26-15569 | C | 24.04 V | 88.3% | 52 mV | Pass | Shipped |
| KT26-15570 | C | 23.98 V | 87% | 21 mV | Pass | Shipped |
| KT26-15571 | C | 23.97 V | 88.9% | 47 mV | Pass | Shipped |
| KT26-15572 | C | 24.04 V | 88.3% | 23 mV | Pass | Shipped |
| KT26-15573 | C | 23.98 V | 88.2% | 42 mV | Pass | Shipped |
| KT26-15574 | C | 24.03 V | 89% | 48 mV | Pass | Shipped |
| KT26-15575 | C | 24.04 V | 89.5% | 50 mV | Pass | Shipped |
| KT26-15576 | C | 24.04 V | 89% | 20 mV | Pass | Shipped |
| KT26-15577 | C | 24.03 V | 88.7% | 45 mV | Pass | Shipped |
| KT26-15578 | C | 23.99 V | 87.7% | 45 mV | Pass | Shipped |
| KT26-15579 | C | 24.03 V | 87.1% | 37 mV | Pass | Shipped |
| KT26-15580 | C | 23.96 V | 89.1% | 47 mV | Pass | Shipped |
| KT26-15581 | C | 23.96 V | 88.9% | 27 mV | Pass | Shipped |
| KT26-15582 | C | 23.97 V | 88.4% | 53 mV | Pass | Shipped |
| KT26-15583 | C | 24.05 V | 88.6% | 35 mV | Pass | Shipped |
| KT26-15584 | C | 24.00 V | 87.9% | 36 mV | Pass | Shipped |
| KT26-15585 | C | 24.01 V | 87% | 25 mV | Pass | Shipped |
| KT26-15586 | C | 24.03 V | 89% | 22 mV | Pass | Shipped |
| KT26-15587 | C | 23.95 V | 88.7% | 42 mV | Pass | Shipped |
| KT26-15588 | C | 23.98 V | 88.3% | 31 mV | Pass | Shipped |
| KT26-15589 | C | 24.01 V | 88.1% | 60 mV | Pass | Shipped |
| KT26-15590 | C | 23.99 V | 87% | 24 mV | Pass | Shipped |
| KT26-15591 | C | 23.95 V | 87.1% | 37 mV | Pass | Shipped |
Works order
- Builds
- GBX60-48-24
- Quantity
- 51 · 51 built
- Stage
- Complete
- For
- SO-26-0284Kestrel Defence Systems
- Released
- 31 Aug 2026
- Due
- 14 Sep 2026
- Completed
- 14 Sep 2026
- Assigned
- Grace O'Brien
- Build time
- 12.8 h (15 min each)
- Std cost
- $111.49 each · $5,685.99
Build documentsAll →
DWG-GBX60-48-24
Assembly drawing
C ReleasedBOM-GBX60-48-24
Bill of materials
C ReleasedTP-GBX60-48-24
Test procedure
B Released