Kit list — BOM rev B × 12Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBX sub-assy Enclosure kit, GBX | K5-03 | 1 ea | 12 | 77 | Issued |
| PSA-USB sub-assy Power PCBA, modular USB charger | K2-05 | 1 ea | 12 | 36 | Issued |
| J-PC5-2 Terminal block 2-pos 5.08mm | D2-01 | 1 ea | 12 | 311 | Issued |
| P-CTN-S Carton small, printed | H1-01 | 1 ea | 12 | 280 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 12 | 247 | Issued |
Serials & test records (12)All →
First unit KT26-15851 · tested by Josh Mitchell on 09 Oct 2026
Input
4 VDC
Output @ 100%
4.00 V
Efficiency
90.3%
Ripple
28 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15851 | B | 4.00 V | 90.3% | 28 mV | Pass | Shipped |
| KT26-15852 | B | 4.00 V | 91.8% | 62 mV | Pass | Shipped |
| KT26-15853 | B | 4.00 V | 92.4% | 48 mV | Pass | Shipped |
| KT26-15854 | B | 4.01 V | 91.6% | 47 mV | Pass | Shipped |
| KT26-15855 | B | 4.00 V | 92.4% | 19 mV | Pass | Shipped |
| KT26-15856 | B | 4.00 V | 91.5% | 18 mV | Pass | Shipped |
| KT26-15857 | B | 4.00 V | 91.4% | 19 mV | Pass | Shipped |
| KT26-15858 | B | 3.99 V | 93.5% | 48 mV | Pass | Shipped |
| KT26-15859 | B | 4.00 V | 90.1% | 40 mV | Pass | Shipped |
| KT26-15860 | B | 4.00 V | 91.4% | 29 mV | Pass | Shipped |
| KT26-15861 | B | 4.00 V | 93.2% | 38 mV | Pass | Shipped |
| KT26-15862 | B | 4.00 V | 92.1% | 26 mV | Pass | Shipped |
Works order
- Builds
- MUC-4
- Quantity
- 12 · 12 built
- Stage
- Complete
- For
- SO-26-0292Apex Transit Electronics
- Released
- 25 Sep 2026
- Due
- 19 Oct 2026
- Completed
- 09 Oct 2026
- Assigned
- Linh Nguyen
- Build time
- 3 h (15 min each)
- Std cost
- $151.60 each · $1,819.20
Build documentsAll →
DWG-MUC-4
Assembly drawing
B ReleasedBOM-MUC-4
Bill of materials
B ReleasedTP-MUC-4
Test procedure
A Released