Kit list — BOM rev C × 20Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBX sub-assy Enclosure kit, GBX | K5-03 | 1 ea | 20 | 77 | Issued |
| PSA-GBX60 sub-assy Power stage PCBA, GBX 60W | K2-09 | 1 ea | 20 | 34 | Issued |
| J-PC5-2 Terminal block 2-pos 5.08mm | D2-01 | 2 ea | 40 | 311 | Issued |
| P-CTN-S Carton small, printed | H1-01 | 1 ea | 20 | 280 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 20 | 247 | Issued |
Serials & test records (20)All →
First unit KT26-16170 · tested by Tom Barker on 02 Nov 2026
Input
48 VDC
Output @ 100%
24.04 V
Efficiency
89.6%
Ripple
20 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-16170 | C | 24.04 V | 89.6% | 20 mV | Pass | Shipped |
| KT26-16171 | C | 24.01 V | 88.7% | 39 mV | Pass | Shipped |
| KT26-16172 | C | 24.03 V | 87.6% | 29 mV | Pass | Shipped |
| KT26-16173 | C | 24.04 V | 89.9% | 30 mV | Pass | Shipped |
| KT26-16174 | C | 24.00 V | 89.3% | 39 mV | Pass | Shipped |
| KT26-16175 | C | 24.01 V | 88.5% | 35 mV | Pass | Shipped |
| KT26-16176 | C | 24.00 V | 87.8% | 39 mV | Pass | Shipped |
| KT26-16177 | C | 24.01 V | 89.2% | 27 mV | Repaired | Shipped |
| KT26-16178 | C | 23.98 V | 89.7% | 18 mV | Pass | Shipped |
| KT26-16179 | C | 24.02 V | 89.2% | 44 mV | Pass | Shipped |
| KT26-16180 | C | 23.96 V | 88.8% | 58 mV | Pass | Shipped |
| KT26-16181 | C | 24.03 V | 89.7% | 58 mV | Pass | Shipped |
| KT26-16182 | C | 24.04 V | 88.9% | 41 mV | Pass | Shipped |
| KT26-16183 | C | 23.95 V | 87.3% | 24 mV | Pass | Shipped |
| KT26-16184 | C | 24.04 V | 87.3% | 51 mV | Pass | Shipped |
| KT26-16185 | C | 24.00 V | 87.5% | 20 mV | Pass | Shipped |
| KT26-16186 | C | 23.98 V | 89.4% | 42 mV | Pass | Shipped |
| KT26-16187 | C | 23.96 V | 88.7% | 62 mV | Pass | Shipped |
| KT26-16188 | C | 24.05 V | 87.2% | 50 mV | Pass | Shipped |
| KT26-16189 | C | 24.04 V | 89.2% | 30 mV | Pass | Shipped |
Works order
- Builds
- GBX60-48-24
- Quantity
- 20 · 20 built
- Stage
- Complete
- For
- SO-26-0321Lumen Marine Systems
- Released
- 19 Oct 2026
- Due
- 28 Oct 2026
- Completed
- 02 Nov 2026
- Assigned
- Hassan Ali
- Build time
- 5 h (15 min each)
- Std cost
- $111.49 each · $2,229.80
Build documentsAll →
DWG-GBX60-48-24
Assembly drawing
C ReleasedBOM-GBX60-48-24
Bill of materials
C ReleasedTP-GBX60-48-24
Test procedure
B Released