Kit list — BOM rev C × 18Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBX sub-assy Enclosure kit, GBX | K5-03 | 1 ea | 18 | 77 | Issued |
| PSA-GBX30 sub-assy Power stage PCBA, GBX 30W | K2-01 | 1 ea | 18 | 16 | Issued |
| J-PC5-2 Terminal block 2-pos 5.08mm | D2-01 | 2 ea | 36 | 311 | Issued |
| P-CTN-S Carton small, printed | H1-01 | 1 ea | 18 | 280 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 18 | 247 | Issued |
Serials & test records (18)All →
First unit KT26-14993 · tested by Josh Mitchell on 07 Jul 2026
Input
24 VDC
Output @ 100%
12.01 V
Efficiency
87.2%
Ripple
35 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-14993 | C | 12.01 V | 87.2% | 35 mV | Pass | Shipped |
| KT26-14994 | C | 12.01 V | 87.6% | 41 mV | Pass | Shipped |
| KT26-14995 | C | 11.98 V | 88.3% | 43 mV | Pass | Shipped |
| KT26-14996 | C | 12.01 V | 89.6% | 34 mV | Pass | Shipped |
| KT26-14997 | C | 12.01 V | 88.2% | 47 mV | Pass | Shipped |
| KT26-14998 | C | 12.01 V | 88.3% | 24 mV | Pass | Shipped |
| KT26-14999 | C | 12.00 V | 87.7% | 52 mV | Pass | Shipped |
| KT26-15000 | C | 12.00 V | 88.3% | 19 mV | Pass | Shipped |
| KT26-15001 | C | 12.01 V | 88.4% | 54 mV | Pass | Shipped |
| KT26-15002 | C | 11.99 V | 89.1% | 57 mV | Pass | Shipped |
| KT26-15003 | C | 12.02 V | 89.1% | 58 mV | Repaired | Shipped |
| KT26-15004 | C | 11.99 V | 88.8% | 27 mV | Pass | Shipped |
| KT26-15005 | C | 12.00 V | 87.1% | 47 mV | Pass | Shipped |
| KT26-15006 | C | 12.01 V | 88.2% | 45 mV | Repaired | Shipped |
| KT26-15007 | C | 12.01 V | 87.3% | 57 mV | Pass | Shipped |
| KT26-15008 | C | 11.98 V | 88.3% | 22 mV | Pass | Shipped |
| KT26-15009 | C | 11.98 V | 87.3% | 23 mV | Pass | Shipped |
| KT26-15010 | C | 11.98 V | 87.5% | 23 mV | Repaired | Shipped |
Works order
- Builds
- GBX30-24-12
- Quantity
- 18 · 18 built
- Stage
- Complete
- For
- SO-26-0270Ozpower Industrial Supplies
- Released
- 17 Jun 2026
- Due
- 07 Jul 2026
- Completed
- 07 Jul 2026
- Assigned
- Andrew Costa
- Build time
- 4.5 h (15 min each)
- Std cost
- $96.08 each · $1,729.44
Build documentsAll →
DWG-GBX30-24-12
Assembly drawing
C ReleasedBOM-GBX30-24-12
Bill of materials
C ReleasedTP-GBX30-24-12
Test procedure
B Released