Kit list — BOM rev C × 19Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CTL-GBP2 sub-assy Control PCBA, GBP2 / GBP2-R | K3-05 | 1 ea | 19 | 26 | Issued |
| ENC-GBP2 sub-assy Enclosure kit, GBP2 | K5-08 | 1 ea | 19 | 39 | Issued |
| HAR-GBP2 sub-assy Output harness, GBP2 | K4-02 | 1 ea | 19 | 41 | Issued |
| PSA-P360 sub-assy Power stage PCBA, GBP2 360W | K2-07 | 1 ea | 19 | 10 | Issued |
| J-PC5-4 Terminal block 4-pos 5.08mm | D2-02 | 1 ea | 19 | 326 | Issued |
| P-CTN-M Carton medium, printed | H1-02 | 1 ea | 19 | 482 | Issued |
| P-FOAM Foam insert, die cut | H1-04 | 1 ea | 19 | 424 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 19 | 247 | Issued |
Serials & test records (19)All →
First unit KT26-15011 · tested by Tom Barker on 03 Aug 2026
Input
110 VDC
Output @ 100%
23.97 V
Efficiency
90.1%
Ripple
35 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15011 | C | 23.97 V | 90.1% | 35 mV | Pass | Shipped |
| KT26-15012 | C | 23.99 V | 91.3% | 39 mV | Pass | Shipped |
| KT26-15013 | C | 24.03 V | 93.1% | 44 mV | Pass | Shipped |
| KT26-15014 | C | 23.98 V | 93.3% | 52 mV | Pass | Shipped |
| KT26-15015 | C | 24.01 V | 90.7% | 43 mV | Pass | Shipped |
| KT26-15016 | C | 24.03 V | 91.4% | 26 mV | Pass | Shipped |
| KT26-15017 | C | 23.95 V | 91.4% | 32 mV | Pass | Shipped |
| KT26-15018 | C | 23.98 V | 91.9% | 62 mV | Pass | Shipped |
| KT26-15019 | C | 23.98 V | 90.4% | 33 mV | Pass | Shipped |
| KT26-15020 | C | 24.04 V | 93.5% | 56 mV | Pass | Shipped |
| KT26-15021 | C | 24.03 V | 93.3% | 33 mV | Pass | Shipped |
| KT26-15022 | C | 24.03 V | 92.5% | 41 mV | Pass | Shipped |
| KT26-15023 | C | 23.96 V | 92% | 37 mV | Pass | Shipped |
| KT26-15024 | C | 23.99 V | 91.8% | 45 mV | Pass | Shipped |
| KT26-15025 | C | 24.03 V | 92.7% | 18 mV | Pass | Shipped |
| KT26-15026 | C | 23.97 V | 91.2% | 20 mV | Pass | Shipped |
| KT26-15027 | C | 23.99 V | 92% | 56 mV | Pass | Shipped |
| KT26-15028 | C | 24.02 V | 90.7% | 18 mV | Pass | Shipped |
| KT26-15029 | C | 24.01 V | 91.1% | 20 mV | Pass | Shipped |
Works order
- Builds
- GBP2360-110-24
- Quantity
- 19 · 19 built
- Stage
- Complete
- For
- SO-26-0271Metroline Platform Systems
- Released
- 06 Jul 2026
- Due
- 10 Aug 2026
- Completed
- 03 Aug 2026
- Assigned
- Linh Nguyen
- Build time
- 11.1 h (35 min each)
- Std cost
- $513.27 each · $9,752.13
Build documentsAll →
DWG-GBP2360-110-24
Assembly drawing
C ReleasedBOM-GBP2360-110-24
Bill of materials
C ReleasedTP-GBP2360-110-24
Test procedure
B Released