Kit list — BOM rev C × 10Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBP2 sub-assy Enclosure kit, GBP2 | K5-08 | 1 ea | 10 | 39 | Issued |
| HAR-GBP2 sub-assy Output harness, GBP2 | K4-02 | 1 ea | 10 | 41 | Issued |
| PSA-WIC sub-assy Power PCBA, wide-input DC charger | K2-06 | 1 ea | 10 | 3 | Issued |
| P-CTN-M Carton medium, printed | H1-02 | 1 ea | 10 | 482 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 10 | 247 | Issued |
Serials & test records (10)All →
First unit KT26-15030 · tested by Tom Barker on 17 Aug 2026
Input
12 VDC
Output @ 100%
20.00 V
Efficiency
90.4%
Ripple
39 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15030 | C | 20.00 V | 90.4% | 39 mV | Pass | Shipped |
| KT26-15031 | C | 20.01 V | 90.4% | 56 mV | Pass | Shipped |
| KT26-15032 | C | 20.01 V | 90.8% | 30 mV | Pass | Shipped |
| KT26-15033 | C | 20.02 V | 93.5% | 26 mV | Pass | Shipped |
| KT26-15034 | C | 20.03 V | 90.6% | 25 mV | Pass | Shipped |
| KT26-15035 | C | 19.97 V | 91.3% | 26 mV | Pass | Shipped |
| KT26-15036 | C | 19.99 V | 92.5% | 29 mV | Pass | Shipped |
| KT26-15037 | C | 20.01 V | 91.8% | 49 mV | Pass | Shipped |
| KT26-15038 | C | 20.02 V | 93% | 48 mV | Pass | Shipped |
| KT26-15039 | C | 20.03 V | 92.1% | 37 mV | Pass | Shipped |
Works order
- Builds
- WIC-12-20
- Quantity
- 10 · 10 built
- Stage
- Complete
- For
- SO-26-0272Ridgeline Mining Services
- Released
- 04 Aug 2026
- Due
- 19 Aug 2026
- Completed
- 17 Aug 2026
- Assigned
- Grace O'Brien
- Build time
- 4.2 h (25 min each)
- Std cost
- $195.89 each · $1,958.90
Build documentsAll →
DWG-WIC-12-20
Assembly drawing
C ReleasedBOM-WIC-12-20
Bill of materials
C ReleasedTP-WIC-12-20
Test procedure
B Released