Kit list — BOM rev C × 13Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBP2 sub-assy Enclosure kit, GBP2 | K5-08 | 1 ea | 13 | 39 | Issued |
| HAR-GBP2 sub-assy Output harness, GBP2 | K4-02 | 1 ea | 13 | 41 | Issued |
| PSA-WIC sub-assy Power PCBA, wide-input DC charger | K2-06 | 1 ea | 13 | 3 | Issued |
| P-CTN-M Carton medium, printed | H1-02 | 1 ea | 13 | 482 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 13 | 247 | Issued |
Serials & test records (13)All →
First unit KT26-15276 · tested by Tom Barker on 24 Aug 2026
Input
12 VDC
Output @ 100%
20.04 V
Efficiency
93.1%
Ripple
22 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15276 | C | 20.04 V | 93.1% | 22 mV | Pass | Shipped |
| KT26-15277 | C | 19.99 V | 90.8% | 62 mV | Pass | Shipped |
| KT26-15278 | C | 20.01 V | 91.8% | 53 mV | Pass | Shipped |
| KT26-15279 | C | 19.99 V | 91.5% | 42 mV | Pass | Shipped |
| KT26-15280 | C | 19.98 V | 91.9% | 22 mV | Pass | Shipped |
| KT26-15281 | C | 19.97 V | 90.9% | 32 mV | Pass | Shipped |
| KT26-15282 | C | 19.99 V | 91.1% | 46 mV | Pass | Shipped |
| KT26-15283 | C | 19.97 V | 90.4% | 21 mV | Pass | Shipped |
| KT26-15284 | C | 19.98 V | 92.1% | 33 mV | Pass | Shipped |
| KT26-15285 | C | 20.02 V | 91.4% | 36 mV | Pass | Shipped |
| KT26-15286 | C | 19.99 V | 90.3% | 47 mV | Repaired | Shipped |
| KT26-15287 | C | 20.04 V | 93.2% | 62 mV | Pass | Shipped |
| KT26-15288 | C | 20.02 V | 90.3% | 24 mV | Pass | Shipped |
Works order
- Builds
- WIC-12-20
- Quantity
- 13 · 13 built
- Stage
- Complete
- For
- SO-26-0275Sentinel Access Control
- Released
- 20 Jul 2026
- Due
- 24 Aug 2026
- Completed
- 24 Aug 2026
- Assigned
- Hassan Ali
- Build time
- 5.4 h (25 min each)
- Std cost
- $195.89 each · $2,546.57
Build documentsAll →
DWG-WIC-12-20
Assembly drawing
C ReleasedBOM-WIC-12-20
Bill of materials
C ReleasedTP-WIC-12-20
Test procedure
B Released