WO-26-1275

GBX30-12-05 ×57 — GBX30 DC/DC converter 12V → 05V, 30W
MYOB · synced 08:55 Demo 03 Nov 2026
PlannedKittedPCB assemblyFinal assemblyBurn-in & testQC & packComplete
Rev C Traveller
Kit list — BOM rev C × 57Issued from stock
PartBinPer unitNeededOn hand
ENC-GBX sub-assy
Enclosure kit, GBX
K5-031 ea5777Issued
PSA-GBX30 sub-assy
Power stage PCBA, GBX 30W
K2-011 ea5716Issued
J-PC5-2
Terminal block 2-pos 5.08mm
D2-012 ea114311Issued
P-CTN-S
Carton small, printed
H1-011 ea57280Issued
P-GUIDE
Installation guide, printed
H1-051 ea57247Issued
Serials & test records (57)All →
First unit KT26-15635 · tested by Tom Barker on 10 Sep 2026
Input
12 VDC
Output @ 100%
5.00 V
Efficiency
88.2%
Ripple
60 mV
Burn-in
24 h
Result
Pass
SerialRevVoutEff.RippleResultStatus
KT26-15635C5.00 V88.2%60 mVPassShipped
KT26-15636C5.00 V89.4%39 mVPassShipped
KT26-15637C5.00 V88.4%48 mVPassShipped
KT26-15638C5.01 V87.3%26 mVPassShipped
KT26-15639C5.00 V88.6%39 mVPassShipped
KT26-15640C5.00 V89%29 mVPassShipped
KT26-15641C5.00 V87.5%47 mVPassShipped
KT26-15642C4.99 V89.4%41 mVPassShipped
KT26-15643C5.00 V89.5%19 mVPassShipped
KT26-15644C5.00 V89.4%55 mVPassShipped
KT26-15645C4.99 V89.8%54 mVPassShipped
KT26-15646C5.00 V89.1%51 mVPassShipped
KT26-15647C5.00 V87.5%45 mVPassShipped
KT26-15648C5.00 V88.1%58 mVPassShipped
KT26-15649C4.99 V90%31 mVPassShipped
KT26-15650C5.01 V89.8%27 mVPassShipped
KT26-15651C4.99 V88.2%51 mVPassShipped
KT26-15652C4.99 V87.1%33 mVPassShipped
KT26-15653C5.01 V87.6%38 mVPassShipped
KT26-15654C5.00 V89.1%37 mVPassShipped
KT26-15655C5.00 V87.5%62 mVPassShipped
KT26-15656C5.00 V88.4%32 mVPassShipped
KT26-15657C4.99 V87.8%51 mVPassShipped
KT26-15658C4.99 V87.8%24 mVPassShipped
KT26-15659C4.99 V87.9%42 mVPassShipped
KT26-15660C5.00 V88.4%50 mVPassShipped
KT26-15661C5.00 V88.8%41 mVPassShipped
KT26-15662C5.01 V87.1%45 mVPassShipped
KT26-15663C5.01 V87%35 mVPassShipped
KT26-15664C5.00 V89.7%19 mVPassShipped
KT26-15665C5.01 V88.8%57 mVPassShipped
KT26-15666C5.00 V89.2%35 mVPassShipped
KT26-15667C4.99 V88.1%25 mVPassShipped
KT26-15668C5.00 V87.3%44 mVPassShipped
KT26-15669C5.01 V88.5%28 mVPassShipped
KT26-15670C5.01 V88.8%32 mVPassShipped
KT26-15671C4.99 V87.6%35 mVPassShipped
KT26-15672C4.99 V89.4%44 mVPassShipped
KT26-15673C5.01 V89.5%52 mVPassShipped
KT26-15674C4.99 V87%48 mVPassShipped
KT26-15675C5.00 V87.4%60 mVPassShipped
KT26-15676C5.00 V89.2%31 mVRepairedShipped
KT26-15677C4.99 V88.1%26 mVPassShipped
KT26-15678C5.00 V88.5%46 mVPassShipped
KT26-15679C5.00 V88.3%38 mVRepairedShipped
KT26-15680C4.99 V88%19 mVPassShipped
KT26-15681C5.00 V88.6%40 mVPassShipped
KT26-15682C5.01 V87.7%41 mVPassShipped
KT26-15683C5.00 V90%53 mVPassShipped
KT26-15684C5.01 V88.2%38 mVPassShipped
KT26-15685C5.00 V89.4%58 mVPassShipped
KT26-15686C4.99 V87.3%45 mVPassShipped
KT26-15687C5.00 V89.4%57 mVPassShipped
KT26-15688C5.01 V89.8%18 mVPassShipped
KT26-15689C5.00 V87.7%23 mVPassShipped
KT26-15690C5.00 V87.5%59 mVPassShipped
KT26-15691C5.00 V89.7%58 mVPassShipped
Works order
Builds
GBX30-12-05
Quantity
57 · 57 built
Stage
Complete
For
SO-26-0284
Kestrel Defence Systems
Released
31 Aug 2026
Due
14 Sep 2026
Completed
10 Sep 2026
Assigned
Hassan Ali
Build time
14.3 h (15 min each)
Std cost
$96.08 each · $5,476.56
Build documentsAll →
DWG-GBX30-12-05
Assembly drawing
C Released
BOM-GBX30-12-05
Bill of materials
C Released
TP-GBX30-12-05
Test procedure
B Released