Kit list — BOM rev C × 55Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBX sub-assy Enclosure kit, GBX | K5-03 | 1 ea | 55 | 77 | Issued |
| PSA-GBX30 sub-assy Power stage PCBA, GBX 30W | K2-01 | 1 ea | 55 | 16 | Issued |
| J-PC5-2 Terminal block 2-pos 5.08mm | D2-01 | 2 ea | 110 | 311 | Issued |
| P-CTN-S Carton small, printed | H1-01 | 1 ea | 55 | 280 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 55 | 247 | Issued |
Serials & test records (55)All →
First unit KT26-14823 · tested by Josh Mitchell on 10 Jul 2026
Input
12 VDC
Output @ 100%
5.00 V
Efficiency
89.2%
Ripple
59 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-14823 | C | 5.00 V | 89.2% | 59 mV | Pass | Shipped |
| KT26-14824 | C | 5.00 V | 89.1% | 54 mV | Pass | Shipped |
| KT26-14825 | C | 5.00 V | 89.2% | 28 mV | Pass | Shipped |
| KT26-14826 | C | 4.99 V | 89.1% | 36 mV | Pass | Shipped |
| KT26-14827 | C | 5.01 V | 89.5% | 26 mV | Pass | Shipped |
| KT26-14828 | C | 5.00 V | 88.4% | 59 mV | Pass | Shipped |
| KT26-14829 | C | 5.00 V | 88.3% | 56 mV | Pass | Shipped |
| KT26-14830 | C | 5.00 V | 87.4% | 27 mV | Pass | Shipped |
| KT26-14831 | C | 4.99 V | 87.2% | 50 mV | Pass | Shipped |
| KT26-14832 | C | 5.00 V | 87.3% | 30 mV | Pass | Shipped |
| KT26-14833 | C | 5.00 V | 88.8% | 33 mV | Pass | Shipped |
| KT26-14834 | C | 5.01 V | 89.6% | 57 mV | Pass | Shipped |
| KT26-14835 | C | 4.99 V | 89.3% | 24 mV | Pass | Shipped |
| KT26-14836 | C | 5.01 V | 89.6% | 45 mV | Pass | Shipped |
| KT26-14837 | C | 5.01 V | 88.2% | 47 mV | Pass | Shipped |
| KT26-14838 | C | 5.00 V | 90% | 53 mV | Pass | Shipped |
| KT26-14839 | C | 4.99 V | 88.7% | 20 mV | Pass | Shipped |
| KT26-14840 | C | 5.01 V | 87.3% | 36 mV | Pass | Shipped |
| KT26-14841 | C | 4.99 V | 89.7% | 26 mV | Pass | Shipped |
| KT26-14842 | C | 5.00 V | 89% | 62 mV | Pass | Shipped |
| KT26-14843 | C | 5.00 V | 88.7% | 32 mV | Pass | Shipped |
| KT26-14844 | C | 5.00 V | 89% | 56 mV | Pass | Shipped |
| KT26-14845 | C | 5.01 V | 89.9% | 28 mV | Pass | Shipped |
| KT26-14846 | C | 5.00 V | 88.4% | 26 mV | Pass | Shipped |
| KT26-14847 | C | 4.99 V | 87.5% | 52 mV | Pass | Shipped |
| KT26-14848 | C | 4.99 V | 87.5% | 59 mV | Pass | Shipped |
| KT26-14849 | C | 5.00 V | 89.6% | 47 mV | Pass | Shipped |
| KT26-14850 | C | 5.01 V | 89.5% | 19 mV | Pass | Shipped |
| KT26-14851 | C | 4.99 V | 87.6% | 37 mV | Pass | Shipped |
| KT26-14852 | C | 5.00 V | 87.3% | 36 mV | Pass | Shipped |
| KT26-14853 | C | 5.01 V | 88.3% | 29 mV | Pass | Shipped |
| KT26-14854 | C | 4.99 V | 87% | 44 mV | Pass | Shipped |
| KT26-14855 | C | 5.00 V | 88.3% | 22 mV | Pass | Shipped |
| KT26-14856 | C | 5.00 V | 88.8% | 39 mV | Pass | Shipped |
| KT26-14857 | C | 5.01 V | 88.1% | 38 mV | Pass | Shipped |
| KT26-14858 | C | 5.01 V | 88.8% | 58 mV | Repaired | Shipped |
| KT26-14859 | C | 5.01 V | 87.6% | 53 mV | Pass | Shipped |
| KT26-14860 | C | 5.00 V | 88.7% | 52 mV | Pass | Shipped |
| KT26-14861 | C | 5.01 V | 89.4% | 37 mV | Pass | Shipped |
| KT26-14862 | C | 5.00 V | 89.4% | 39 mV | Pass | Shipped |
| KT26-14863 | C | 5.00 V | 87.2% | 53 mV | Pass | Shipped |
| KT26-14864 | C | 5.00 V | 89.1% | 45 mV | Pass | Shipped |
| KT26-14865 | C | 4.99 V | 89% | 37 mV | Pass | Shipped |
| KT26-14866 | C | 5.01 V | 89.1% | 49 mV | Pass | Shipped |
| KT26-14867 | C | 5.00 V | 88.7% | 22 mV | Pass | Shipped |
| KT26-14868 | C | 5.00 V | 87.8% | 60 mV | Pass | Shipped |
| KT26-14869 | C | 5.01 V | 87.2% | 40 mV | Pass | Shipped |
| KT26-14870 | C | 5.01 V | 88% | 49 mV | Pass | Shipped |
| KT26-14871 | C | 4.99 V | 88.2% | 53 mV | Pass | Shipped |
| KT26-14872 | C | 5.00 V | 88.9% | 19 mV | Pass | Shipped |
| KT26-14873 | C | 5.00 V | 88.6% | 46 mV | Pass | Shipped |
| KT26-14874 | C | 5.01 V | 88.9% | 48 mV | Pass | Shipped |
| KT26-14875 | C | 4.99 V | 87.8% | 33 mV | Pass | Shipped |
| KT26-14876 | C | 5.01 V | 88.1% | 27 mV | Pass | Shipped |
| KT26-14877 | C | 4.99 V | 87.9% | 51 mV | Pass | Shipped |
Works order
- Builds
- GBX30-12-05
- Quantity
- 55 · 55 built
- Stage
- Complete
- For
- SO-26-0265Ozpower Industrial Supplies
- Released
- 10 Jun 2026
- Due
- 20 Jul 2026
- Completed
- 10 Jul 2026
- Assigned
- Hassan Ali
- Build time
- 13.8 h (15 min each)
- Std cost
- $96.08 each · $5,284.40
Build documentsAll →
DWG-GBX30-12-05
Assembly drawing
C ReleasedBOM-GBX30-12-05
Bill of materials
C ReleasedTP-GBX30-12-05
Test procedure
B Released