Kit list — BOM rev C × 17Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBP2 sub-assy Enclosure kit, GBP2 | K5-08 | 1 ea | 17 | 39 | Issued |
| HAR-GBP2 sub-assy Output harness, GBP2 | K4-02 | 1 ea | 17 | 41 | Issued |
| PSA-WIC sub-assy Power PCBA, wide-input DC charger | K2-06 | 1 ea | 17 | 3 | Issued |
| P-CTN-M Carton medium, printed | H1-02 | 1 ea | 17 | 482 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 17 | 247 | Issued |
Serials & test records (17)All →
First unit KT26-15796 · tested by Josh Mitchell on 09 Oct 2026
Input
12 VDC
Output @ 100%
20.03 V
Efficiency
92.4%
Ripple
58 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15796 | C | 20.03 V | 92.4% | 58 mV | Pass | Shipped |
| KT26-15797 | C | 20.01 V | 90.9% | 26 mV | Pass | Shipped |
| KT26-15798 | C | 19.99 V | 90.5% | 19 mV | Pass | Shipped |
| KT26-15799 | C | 20.00 V | 90.1% | 43 mV | Pass | Shipped |
| KT26-15800 | C | 20.00 V | 93% | 47 mV | Pass | Shipped |
| KT26-15801 | C | 20.04 V | 90.7% | 45 mV | Pass | Shipped |
| KT26-15802 | C | 20.04 V | 91% | 20 mV | Pass | Shipped |
| KT26-15803 | C | 20.03 V | 93% | 60 mV | Pass | Shipped |
| KT26-15804 | C | 19.99 V | 91.9% | 53 mV | Pass | Shipped |
| KT26-15805 | C | 19.99 V | 92.8% | 59 mV | Pass | Shipped |
| KT26-15806 | C | 20.01 V | 90.9% | 51 mV | Pass | Shipped |
| KT26-15807 | C | 19.96 V | 92.8% | 49 mV | Pass | Shipped |
| KT26-15808 | C | 20.02 V | 91.3% | 51 mV | Pass | Shipped |
| KT26-15809 | C | 19.98 V | 90.9% | 48 mV | Pass | Shipped |
| KT26-15810 | C | 20.00 V | 90.9% | 40 mV | Pass | Shipped |
| KT26-15811 | C | 19.98 V | 91.4% | 21 mV | Pass | Shipped |
| KT26-15812 | C | 19.98 V | 90.9% | 19 mV | Pass | Shipped |
Works order
- Builds
- WIC-12-20
- Quantity
- 17 · 17 built
- Stage
- Complete
- For
- SO-26-0289Pilbara Process Controls
- Released
- 18 Sep 2026
- Due
- 13 Oct 2026
- Completed
- 09 Oct 2026
- Assigned
- Andrew Costa
- Build time
- 7.1 h (25 min each)
- Std cost
- $195.89 each · $3,330.13
Build documentsAll →
DWG-WIC-12-20
Assembly drawing
C ReleasedBOM-WIC-12-20
Bill of materials
C ReleasedTP-WIC-12-20
Test procedure
B Released