Kit list — BOM rev B × 6Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CTL-GBP2 sub-assy Control PCBA, GBP2 / GBP2-R | K3-05 | 1 ea | 6 | 26 | Issued |
| ENC-GBP2 sub-assy Enclosure kit, GBP2 | K5-08 | 1 ea | 6 | 39 | Issued |
| HAR-GBP2 sub-assy Output harness, GBP2 | K4-02 | 1 ea | 6 | 41 | Issued |
| PSA-P360 sub-assy Power stage PCBA, GBP2 360W | K2-07 | 1 ea | 6 | 10 | Issued |
| J-PC5-4 Terminal block 4-pos 5.08mm | D2-02 | 1 ea | 6 | 326 | Issued |
| P-CTN-M Carton medium, printed | H1-02 | 1 ea | 6 | 482 | Issued |
| P-FOAM Foam insert, die cut | H1-04 | 1 ea | 6 | 424 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 6 | 247 | Issued |
Serials & test records (6)All →
First unit KT26-15882 · tested by Tom Barker on 16 Oct 2026
Input
24 VDC
Output @ 100%
48.07 V
Efficiency
90.6%
Ripple
57 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15882 | B | 48.07 V | 90.6% | 57 mV | Pass | Shipped |
| KT26-15883 | B | 47.96 V | 90.9% | 33 mV | Pass | Shipped |
| KT26-15884 | B | 48.05 V | 90.1% | 22 mV | Pass | Shipped |
| KT26-15885 | B | 47.94 V | 91.6% | 59 mV | Pass | Shipped |
| KT26-15886 | B | 48.02 V | 92.7% | 27 mV | Pass | Shipped |
| KT26-15887 | B | 48.05 V | 93.2% | 26 mV | Pass | Shipped |
Works order
- Builds
- GBP2360-24-48
- Quantity
- 6 · 6 built
- Stage
- Complete
- For
- SO-26-0295Southern Cross Rolling Stock
- Released
- 02 Oct 2026
- Due
- 21 Oct 2026
- Completed
- 16 Oct 2026
- Assigned
- Grace O'Brien
- Build time
- 3.5 h (35 min each)
- Std cost
- $513.27 each · $3,079.62
Build documentsAll →
DWG-GBP2360-24-48
Assembly drawing
B ReleasedBOM-GBP2360-24-48
Bill of materials
B ReleasedTP-GBP2360-24-48
Test procedure
A Released