KaRaTec

WO-26-1291

GBP2360-110-24 ×14 — GBP2 DC/DC converter 110V → 24V, 360W
MYOB · synced 08:55 Demo 03 Nov 2026
PlannedKittedPCB assemblyFinal assemblyBurn-in & testQC & packComplete
Rev C Traveller
Kit list — BOM rev C × 14Issued from stock
PartBinPer unitNeededOn hand
CTL-GBP2 sub-assy
Control PCBA, GBP2 / GBP2-R
K3-051 ea1426Issued
ENC-GBP2 sub-assy
Enclosure kit, GBP2
K5-081 ea1439Issued
HAR-GBP2 sub-assy
Output harness, GBP2
K4-021 ea1441Issued
PSA-P360 sub-assy
Power stage PCBA, GBP2 360W
K2-071 ea1410Issued
J-PC5-4
Terminal block 4-pos 5.08mm
D2-021 ea14326Issued
P-CTN-M
Carton medium, printed
H1-021 ea14482Issued
P-FOAM
Foam insert, die cut
H1-041 ea14424Issued
P-GUIDE
Installation guide, printed
H1-051 ea14247Issued
Serials & test records (14)All →
First unit KT26-15888 · tested by Josh Mitchell on 06 Oct 2026
Input
110 VDC
Output @ 100%
24.02 V
Efficiency
90.6%
Ripple
53 mV
Burn-in
24 h
Result
Pass
SerialRevVoutEff.RippleResultStatus
KT26-15888C24.02 V90.6%53 mVPassShipped
KT26-15889C23.96 V90.7%61 mVPassShipped
KT26-15890C24.01 V93.4%50 mVPassShipped
KT26-15891C23.98 V91.7%27 mVPassShipped
KT26-15892C24.02 V91.4%32 mVPassShipped
KT26-15893C24.02 V90%19 mVPassShipped
KT26-15894C24.01 V92.5%29 mVPassShipped
KT26-15895C23.95 V92.6%53 mVPassShipped
KT26-15896C24.01 V92%31 mVPassShipped
KT26-15897C23.97 V90.7%44 mVPassShipped
KT26-15898C24.03 V91.1%47 mVPassShipped
KT26-15899C24.01 V92.8%41 mVPassShipped
KT26-15900C24.02 V91.1%28 mVPassShipped
KT26-15901C23.99 V91.7%27 mVPassShipped
Works order
Builds
GBP2360-110-24
Quantity
14 · 14 built
Stage
Complete
For
SO-26-0296
Southern Cross Rolling Stock
Released
18 Sep 2026
Due
12 Oct 2026
Completed
06 Oct 2026
Assigned
Andrew Costa
Build time
8.2 h (35 min each)
Std cost
$513.27 each · $7,185.78
Build documentsAll →
DWG-GBP2360-110-24
Assembly drawing
C Released
BOM-GBP2360-110-24
Bill of materials
C Released
TP-GBP2360-110-24
Test procedure
B Released