Kit list — BOM rev C × 14Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CTL-GBP2 sub-assy Control PCBA, GBP2 / GBP2-R | K3-05 | 1 ea | 14 | 26 | Issued |
| ENC-GBP2 sub-assy Enclosure kit, GBP2 | K5-08 | 1 ea | 14 | 39 | Issued |
| HAR-GBP2 sub-assy Output harness, GBP2 | K4-02 | 1 ea | 14 | 41 | Issued |
| PSA-P360 sub-assy Power stage PCBA, GBP2 360W | K2-07 | 1 ea | 14 | 10 | Issued |
| J-PC5-4 Terminal block 4-pos 5.08mm | D2-02 | 1 ea | 14 | 326 | Issued |
| P-CTN-M Carton medium, printed | H1-02 | 1 ea | 14 | 482 | Issued |
| P-FOAM Foam insert, die cut | H1-04 | 1 ea | 14 | 424 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 14 | 247 | Issued |
Serials & test records (14)All →
First unit KT26-15888 · tested by Josh Mitchell on 06 Oct 2026
Input
110 VDC
Output @ 100%
24.02 V
Efficiency
90.6%
Ripple
53 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15888 | C | 24.02 V | 90.6% | 53 mV | Pass | Shipped |
| KT26-15889 | C | 23.96 V | 90.7% | 61 mV | Pass | Shipped |
| KT26-15890 | C | 24.01 V | 93.4% | 50 mV | Pass | Shipped |
| KT26-15891 | C | 23.98 V | 91.7% | 27 mV | Pass | Shipped |
| KT26-15892 | C | 24.02 V | 91.4% | 32 mV | Pass | Shipped |
| KT26-15893 | C | 24.02 V | 90% | 19 mV | Pass | Shipped |
| KT26-15894 | C | 24.01 V | 92.5% | 29 mV | Pass | Shipped |
| KT26-15895 | C | 23.95 V | 92.6% | 53 mV | Pass | Shipped |
| KT26-15896 | C | 24.01 V | 92% | 31 mV | Pass | Shipped |
| KT26-15897 | C | 23.97 V | 90.7% | 44 mV | Pass | Shipped |
| KT26-15898 | C | 24.03 V | 91.1% | 47 mV | Pass | Shipped |
| KT26-15899 | C | 24.01 V | 92.8% | 41 mV | Pass | Shipped |
| KT26-15900 | C | 24.02 V | 91.1% | 28 mV | Pass | Shipped |
| KT26-15901 | C | 23.99 V | 91.7% | 27 mV | Pass | Shipped |
Works order
- Builds
- GBP2360-110-24
- Quantity
- 14 · 14 built
- Stage
- Complete
- For
- SO-26-0296Southern Cross Rolling Stock
- Released
- 18 Sep 2026
- Due
- 12 Oct 2026
- Completed
- 06 Oct 2026
- Assigned
- Andrew Costa
- Build time
- 8.2 h (35 min each)
- Std cost
- $513.27 each · $7,185.78
Build documentsAll →
DWG-GBP2360-110-24
Assembly drawing
C ReleasedBOM-GBP2360-110-24
Bill of materials
C ReleasedTP-GBP2360-110-24
Test procedure
B Released