Kit list — BOM rev B × 8Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CTL-GBP2 sub-assy Control PCBA, GBP2 / GBP2-R | K3-05 | 1 ea | 8 | 26 | Issued |
| ENC-GBP2 sub-assy Enclosure kit, GBP2 | K5-08 | 1 ea | 8 | 39 | Issued |
| HAR-GBP2 sub-assy Output harness, GBP2 | K4-02 | 1 ea | 8 | 41 | Issued |
| PSA-P360 sub-assy Power stage PCBA, GBP2 360W | K2-07 | 1 ea | 8 | 10 | Issued |
| J-PC5-4 Terminal block 4-pos 5.08mm | D2-02 | 1 ea | 8 | 326 | Issued |
| P-CTN-M Carton medium, printed | H1-02 | 1 ea | 8 | 482 | Issued |
| P-FOAM Foam insert, die cut | H1-04 | 1 ea | 8 | 424 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 8 | 247 | Issued |
Serials & test records (0)
Serial numbers are minted when the build is completed, each with its burn-in and test record.
Works order
- Builds
- GBP2360-24-48
- Quantity
- 8
- Stage
- Burn-in & test
- For
- SO-26-0303Ridgeline Mining Services
- Released
- 09 Oct 2026
- Due
- 12 Nov 2026
- Assigned
- Linh Nguyen
- Build time
- 4.7 h (35 min each)
- Std cost
- $513.27 each · $4,106.16
Build documentsAll →
DWG-GBP2360-24-48
Assembly drawing
B ReleasedBOM-GBP2360-24-48
Bill of materials
B ReleasedTP-GBP2360-24-48
Test procedure
A Released