Kit list — BOM rev C × 25Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| ENC-GBX sub-assy Enclosure kit, GBX | K5-03 | 1 ea | 25 | 77 | Issued |
| PSA-GBX30 sub-assy Power stage PCBA, GBX 30W | K2-01 | 1 ea | 25 | 16 | Issued |
| J-PC5-2 Terminal block 2-pos 5.08mm | D2-01 | 2 ea | 50 | 311 | Issued |
| P-CTN-S Carton small, printed | H1-01 | 1 ea | 25 | 280 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 25 | 247 | Issued |
Serials & test records (25)All →
First unit KT26-15996 · tested by Josh Mitchell on 02 Nov 2026
Input
24 VDC
Output @ 100%
12.01 V
Efficiency
89.5%
Ripple
61 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15996 | C | 12.01 V | 89.5% | 61 mV | Pass | In stock |
| KT26-15997 | C | 12.02 V | 89.8% | 43 mV | Pass | In stock |
| KT26-15998 | C | 12.01 V | 88.4% | 34 mV | Pass | In stock |
| KT26-15999 | C | 12.01 V | 88% | 41 mV | Pass | In stock |
| KT26-16000 | C | 12.02 V | 87.4% | 48 mV | Pass | In stock |
| KT26-16001 | C | 12.01 V | 87.5% | 22 mV | Pass | In stock |
| KT26-16002 | C | 11.98 V | 88.9% | 23 mV | Pass | In stock |
| KT26-16003 | C | 11.99 V | 87.7% | 44 mV | Pass | In stock |
| KT26-16004 | C | 12.02 V | 88.9% | 51 mV | Pass | In stock |
| KT26-16005 | C | 11.98 V | 87.4% | 23 mV | Pass | In stock |
| KT26-16006 | C | 11.99 V | 88.8% | 48 mV | Pass | In stock |
| KT26-16007 | C | 12.01 V | 88.2% | 58 mV | Pass | In stock |
| KT26-16008 | C | 11.98 V | 88.3% | 23 mV | Repaired | In stock |
| KT26-16009 | C | 12.01 V | 89.4% | 40 mV | Pass | In stock |
| KT26-16010 | C | 11.98 V | 89.2% | 47 mV | Pass | In stock |
| KT26-16011 | C | 12.02 V | 88% | 57 mV | Pass | In stock |
| KT26-16012 | C | 11.99 V | 89.1% | 33 mV | Pass | In stock |
| KT26-16013 | C | 11.99 V | 89.6% | 40 mV | Pass | In stock |
| KT26-16014 | C | 12.01 V | 87.2% | 57 mV | Pass | In stock |
| KT26-16015 | C | 11.99 V | 89.4% | 24 mV | Pass | In stock |
| KT26-16016 | C | 12.02 V | 87.5% | 22 mV | Pass | In stock |
| KT26-16017 | C | 12.01 V | 89.8% | 25 mV | Pass | In stock |
| KT26-16018 | C | 11.98 V | 89.4% | 44 mV | Pass | In stock |
| KT26-16019 | C | 12.02 V | 89.3% | 31 mV | Pass | In stock |
| KT26-16020 | C | 11.98 V | 89.2% | 30 mV | Pass | In stock |
Works order
- Builds
- GBX30-24-12
- Quantity
- 25 · 25 built
- Stage
- Complete
- For
- SO-26-0315Ozpower Industrial Supplies
- Released
- 22 Oct 2026
- Due
- 02 Nov 2026
- Completed
- 02 Nov 2026
- Assigned
- Hassan Ali
- Build time
- 6.3 h (15 min each)
- Std cost
- $96.08 each · $2,402.00
Build documentsAll →
DWG-GBX30-24-12
Assembly drawing
C ReleasedBOM-GBX30-24-12
Bill of materials
C ReleasedTP-GBX30-24-12
Test procedure
B Released