KaRaTec

WO-26-1337

GBX30-12-05 ×30 — GBX30 DC/DC converter 12V → 05V, 30W
MYOB · synced 08:55 Demo 03 Nov 2026
PlannedKittedPCB assemblyFinal assemblyBurn-in & testQC & packComplete
Rev C Traveller
Kit list — BOM rev C × 30Issued from stock
PartBinPer unitNeededOn hand
ENC-GBX sub-assy
Enclosure kit, GBX
K5-031 ea3077Issued
PSA-GBX30 sub-assy
Power stage PCBA, GBX 30W
K2-011 ea3016Issued
J-PC5-2
Terminal block 2-pos 5.08mm
D2-012 ea60311Issued
P-CTN-S
Carton small, printed
H1-011 ea30280Issued
P-GUIDE
Installation guide, printed
H1-051 ea30247Issued
Serials & test records (30)All →
First unit KT26-16134 · tested by Tom Barker on 26 Oct 2026
Input
12 VDC
Output @ 100%
4.99 V
Efficiency
87.8%
Ripple
49 mV
Burn-in
24 h
Result
Pass
SerialRevVoutEff.RippleResultStatus
KT26-16134C4.99 V87.8%49 mVPassShipped
KT26-16135C5.00 V87.8%55 mVPassShipped
KT26-16136C5.00 V88.3%36 mVPassShipped
KT26-16137C5.00 V89.4%42 mVPassShipped
KT26-16138C5.01 V87.4%30 mVPassShipped
KT26-16139C4.99 V89.1%52 mVPassShipped
KT26-16140C5.00 V88.8%50 mVPassShipped
KT26-16141C5.01 V87.2%27 mVPassShipped
KT26-16142C5.01 V89.7%23 mVPassShipped
KT26-16143C5.00 V88.5%52 mVRepairedShipped
KT26-16144C5.00 V87.2%42 mVRepairedShipped
KT26-16145C4.99 V87%60 mVPassShipped
KT26-16146C5.00 V87%53 mVPassShipped
KT26-16147C5.00 V88.5%24 mVPassShipped
KT26-16148C5.00 V87.9%35 mVPassShipped
KT26-16149C4.99 V88.5%42 mVPassShipped
KT26-16150C5.01 V89%38 mVRepairedShipped
KT26-16151C5.00 V87.3%39 mVPassShipped
KT26-16152C5.00 V88.1%18 mVPassShipped
KT26-16153C5.00 V87.8%24 mVPassShipped
KT26-16154C5.00 V87.7%45 mVPassShipped
KT26-16155C5.00 V87.5%23 mVPassShipped
KT26-16156C5.00 V88.6%46 mVPassShipped
KT26-16157C5.00 V87.7%57 mVPassShipped
KT26-16158C5.00 V87.4%62 mVPassShipped
KT26-16159C4.99 V89.3%23 mVPassShipped
KT26-16160C5.01 V87.7%32 mVPassShipped
KT26-16161C5.00 V88.9%52 mVPassShipped
KT26-16162C5.00 V89.9%57 mVPassShipped
KT26-16163C5.01 V89.9%49 mVPassShipped
Works order
Builds
GBX30-12-05
Quantity
30 · 30 built
Stage
Complete
For
SO-26-0319
Volt Distribution Australia
Released
16 Oct 2026
Due
27 Oct 2026
Completed
26 Oct 2026
Assigned
Hassan Ali
Build time
7.5 h (15 min each)
Std cost
$96.08 each · $2,882.40
Build documentsAll →
DWG-GBX30-12-05
Assembly drawing
C Released
BOM-GBX30-12-05
Bill of materials
C Released
TP-GBX30-12-05
Test procedure
B Released