Kit list — BOM rev C × 18Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CTL-GBP2 sub-assy Control PCBA, GBP2 / GBP2-R | K3-05 | 1 ea | 18 | 26 | Issued |
| ENC-RAIL sub-assy Enclosure kit, rail IP66 | K5-08 | 1 ea | 18 | 20 | Issued |
| FLT-RAIL sub-assy Input filter PCBA, EN50155 | K3-04 | 1 ea | 18 | 21 | Issued |
| PSA-P240 sub-assy Power stage PCBA, GBP2 240W | K2-02 | 1 ea | 18 | 10 | Issued |
| J-M12-4 M12 4-pin panel connector | D2-04 | 1 ea | 18 | 78 | Issued |
| J-M12-8 M12 8-pin A-coded panel connector | D2-03 | 1 ea | 18 | 26 | Issued |
| P-CTN-L Carton large, printed | H1-03 | 1 ea | 18 | 150 | Issued |
| P-FOAM Foam insert, die cut | H1-04 | 1 ea | 18 | 424 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 18 | 247 | Issued |
Serials & test records (18)All →
First unit KT26-15523 · tested by Tom Barker on 04 Sep 2026
Input
72 VDC
Output @ 100%
23.99 V
Efficiency
93.4%
Ripple
34 mV
Burn-in
48 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15523 | C | 23.99 V | 93.4% | 34 mV | Pass | Shipped |
| KT26-15524 | C | 24.00 V | 90.8% | 40 mV | Pass | Shipped |
| KT26-15525 | C | 23.99 V | 92.3% | 48 mV | Pass | Shipped |
| KT26-15526 | C | 23.99 V | 91.9% | 41 mV | Pass | Shipped |
| KT26-15527 | C | 23.98 V | 92.4% | 53 mV | Pass | Shipped |
| KT26-15528 | C | 24.03 V | 92.1% | 30 mV | Pass | Shipped |
| KT26-15529 | C | 23.99 V | 92.7% | 37 mV | Pass | Shipped |
| KT26-15530 | C | 24.00 V | 91.1% | 52 mV | Pass | Shipped |
| KT26-15531 | C | 24.03 V | 91.5% | 43 mV | Pass | Shipped |
| KT26-15532 | C | 24.02 V | 92.5% | 57 mV | Pass | Shipped |
| KT26-15533 | C | 23.96 V | 90.6% | 25 mV | Pass | Shipped |
| KT26-15534 | C | 24.02 V | 91.3% | 28 mV | Pass | Shipped |
| KT26-15535 | C | 23.96 V | 90.6% | 18 mV | Pass | Shipped |
| KT26-15536 | C | 24.02 V | 91.7% | 54 mV | Pass | Shipped |
| KT26-15537 | C | 23.99 V | 93.2% | 39 mV | Pass | Shipped |
| KT26-15538 | C | 24.04 V | 90.7% | 28 mV | Pass | Shipped |
| KT26-15539 | C | 23.98 V | 90.2% | 35 mV | Pass | Shipped |
| KT26-15540 | C | 24.01 V | 92.8% | 36 mV | Pass | Shipped |
Works order
- Builds
- GBP2150R-72-24
- Quantity
- 18 · 18 built
- Stage
- Complete
- For
- SO-26-0283Pacific Rail Systems
- Released
- 17 Aug 2026
- Due
- 07 Sep 2026
- Completed
- 04 Sep 2026
- Assigned
- Hassan Ali
- Build time
- 18 h (60 min each)
- Std cost
- $633.35 each · $11,400.30
Build documentsAll →
DWG-GBP2150R-72-24
Assembly drawing
C ReleasedBOM-GBP2150R-72-24
Bill of materials
C ReleasedTP-GBP2150R-72-24
Test procedure
B Released