Kit list — BOM rev B × 13Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CTL-GBP2 sub-assy Control PCBA, GBP2 / GBP2-R | K3-05 | 1 ea | 13 | 26 | Issued |
| ENC-RAIL sub-assy Enclosure kit, rail IP66 | K5-08 | 1 ea | 13 | 20 | Issued |
| FLT-RAIL sub-assy Input filter PCBA, EN50155 | K3-04 | 1 ea | 13 | 21 | Issued |
| PSA-R300 sub-assy Power stage PCBA, rail 300W (72–110V in) | K2-01 | 1 ea | 13 | 14 | Issued |
| J-M12-4 M12 4-pin panel connector | D2-04 | 1 ea | 13 | 78 | Issued |
| J-M12-8 M12 8-pin A-coded panel connector | D2-03 | 1 ea | 13 | 26 | Issued |
| P-CTN-L Carton large, printed | H1-03 | 1 ea | 13 | 150 | Issued |
| P-FOAM Foam insert, die cut | H1-04 | 1 ea | 13 | 424 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 13 | 247 | Issued |
Serials & test records (13)All →
First unit KT26-15707 · tested by Josh Mitchell on 21 Sep 2026
Input
110 VDC
Output @ 100%
12.01 V
Efficiency
91.1%
Ripple
60 mV
Burn-in
48 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15707 | B | 12.01 V | 91.1% | 60 mV | Pass | Shipped |
| KT26-15708 | B | 11.99 V | 93.2% | 49 mV | Pass | Shipped |
| KT26-15709 | B | 11.98 V | 90.6% | 39 mV | Repaired | Shipped |
| KT26-15710 | B | 12.02 V | 92.2% | 31 mV | Pass | Shipped |
| KT26-15711 | B | 11.98 V | 90.8% | 18 mV | Pass | Shipped |
| KT26-15712 | B | 12.01 V | 91.6% | 32 mV | Pass | Shipped |
| KT26-15713 | B | 12.00 V | 91.3% | 52 mV | Pass | Shipped |
| KT26-15714 | B | 12.01 V | 92.6% | 32 mV | Pass | Shipped |
| KT26-15715 | B | 11.98 V | 90.6% | 49 mV | Repaired | Shipped |
| KT26-15716 | B | 11.99 V | 90.8% | 22 mV | Pass | Shipped |
| KT26-15717 | B | 12.00 V | 92.4% | 21 mV | Pass | Shipped |
| KT26-15718 | B | 12.00 V | 91.7% | 48 mV | Pass | Shipped |
| KT26-15719 | B | 12.02 V | 92.6% | 27 mV | Pass | Shipped |
Works order
- Builds
- GBP2300R-110-12
- Quantity
- 13 · 13 built
- Stage
- Complete
- For
- SO-26-0286Westrail Signalling Services
- Released
- 01 Sep 2026
- Due
- 21 Sep 2026
- Completed
- 21 Sep 2026
- Assigned
- Andrew Costa
- Build time
- 13 h (60 min each)
- Std cost
- $717.49 each · $9,327.37
Build documentsAll →
DWG-GBP2300R-110-12
Assembly drawing
B ReleasedBOM-GBP2300R-110-12
Bill of materials
B ReleasedTP-GBP2300R-110-12
Test procedure
A Released