Kit list — BOM rev C × 19Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CTL-GBP2 sub-assy Control PCBA, GBP2 / GBP2-R | K3-05 | 1 ea | 19 | 26 | Issued |
| ENC-RAIL sub-assy Enclosure kit, rail IP66 | K5-08 | 1 ea | 19 | 20 | Issued |
| FLT-RAIL sub-assy Input filter PCBA, EN50155 | K3-04 | 1 ea | 19 | 21 | Issued |
| PSA-R300 sub-assy Power stage PCBA, rail 300W (72–110V in) | K2-01 | 1 ea | 19 | 14 | Issued |
| J-M12-4 M12 4-pin panel connector | D2-04 | 1 ea | 19 | 78 | Issued |
| J-M12-8 M12 8-pin A-coded panel connector | D2-03 | 1 ea | 19 | 26 | Issued |
| P-CTN-L Carton large, printed | H1-03 | 1 ea | 19 | 150 | Issued |
| P-FOAM Foam insert, die cut | H1-04 | 1 ea | 19 | 424 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 19 | 247 | Issued |
Serials & test records (19)All →
First unit KT26-15720 · tested by Josh Mitchell on 18 Sep 2026
Input
72 VDC
Output @ 100%
24.03 V
Efficiency
91.8%
Ripple
59 mV
Burn-in
48 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15720 | C | 24.03 V | 91.8% | 59 mV | Pass | Shipped |
| KT26-15721 | C | 24.04 V | 90.3% | 46 mV | Pass | Shipped |
| KT26-15722 | C | 24.02 V | 90.3% | 50 mV | Repaired | Shipped |
| KT26-15723 | C | 23.95 V | 93% | 59 mV | Pass | Shipped |
| KT26-15724 | C | 23.99 V | 91.9% | 21 mV | Pass | Shipped |
| KT26-15725 | C | 23.96 V | 90% | 34 mV | Pass | Shipped |
| KT26-15726 | C | 24.01 V | 93.3% | 27 mV | Pass | Shipped |
| KT26-15727 | C | 24.01 V | 93.5% | 44 mV | Pass | Shipped |
| KT26-15728 | C | 23.96 V | 92.5% | 51 mV | Pass | Shipped |
| KT26-15729 | C | 23.97 V | 91.6% | 59 mV | Pass | Shipped |
| KT26-15730 | C | 23.97 V | 91.9% | 48 mV | Pass | Shipped |
| KT26-15731 | C | 24.01 V | 91.2% | 41 mV | Pass | Shipped |
| KT26-15732 | C | 23.98 V | 91.4% | 30 mV | Pass | Shipped |
| KT26-15733 | C | 24.03 V | 91.3% | 56 mV | Pass | Shipped |
| KT26-15734 | C | 24.01 V | 92.2% | 24 mV | Pass | Shipped |
| KT26-15735 | C | 24.03 V | 91.5% | 38 mV | Pass | Shipped |
| KT26-15736 | C | 24.05 V | 91.8% | 43 mV | Pass | Shipped |
| KT26-15737 | C | 24.02 V | 90.3% | 62 mV | Pass | Shipped |
| KT26-15738 | C | 24.04 V | 91.3% | 56 mV | Pass | Shipped |
Works order
- Builds
- GBP2300R-72-24
- Quantity
- 19 · 19 built
- Stage
- Complete
- For
- SO-26-0286Westrail Signalling Services
- Released
- 03 Sep 2026
- Due
- 21 Sep 2026
- Completed
- 18 Sep 2026
- Assigned
- Linh Nguyen
- Build time
- 19 h (60 min each)
- Std cost
- $717.49 each · $13,632.31
Build documentsAll →
DWG-GBP2300R-72-24
Assembly drawing
C ReleasedBOM-GBP2300R-72-24
Bill of materials
C ReleasedTP-GBP2300R-72-24
Test procedure
B Released