KaRaTec

WO-26-1280

GBP2150R-72-24 ×24 — GBP2-R rail DC/DC converter 72V → 24V, 150W
MYOB · synced 08:55 Demo 03 Nov 2026
PlannedKittedPCB assemblyFinal assemblyBurn-in & testQC & packComplete
Rev C Traveller
Kit list — BOM rev C × 24Issued from stock
PartBinPer unitNeededOn hand
CTL-GBP2 sub-assy
Control PCBA, GBP2 / GBP2-R
K3-051 ea2426Issued
ENC-RAIL sub-assy
Enclosure kit, rail IP66
K5-081 ea2420Issued
FLT-RAIL sub-assy
Input filter PCBA, EN50155
K3-041 ea2421Issued
PSA-P240 sub-assy
Power stage PCBA, GBP2 240W
K2-021 ea2410Issued
J-M12-4
M12 4-pin panel connector
D2-041 ea2478Issued
J-M12-8
M12 8-pin A-coded panel connector
D2-031 ea2426Issued
P-CTN-L
Carton large, printed
H1-031 ea24150Issued
P-FOAM
Foam insert, die cut
H1-041 ea24424Issued
P-GUIDE
Installation guide, printed
H1-051 ea24247Issued
Serials & test records (24)All →
First unit KT26-15749 · tested by Josh Mitchell on 16 Sep 2026
Input
72 VDC
Output @ 100%
23.96 V
Efficiency
91.3%
Ripple
28 mV
Burn-in
48 h
Result
Pass
SerialRevVoutEff.RippleResultStatus
KT26-15749C23.96 V91.3%28 mVPassShipped
KT26-15750C24.00 V90.3%62 mVPassShipped
KT26-15751C23.97 V90.8%38 mVPassShipped
KT26-15752C24.02 V92.4%39 mVPassShipped
KT26-15753C23.98 V90.3%58 mVPassShipped
KT26-15754C24.00 V91.8%21 mVPassShipped
KT26-15755C24.03 V90.8%53 mVPassShipped
KT26-15756C24.02 V90.6%24 mVPassShipped
KT26-15757C23.99 V93.3%26 mVPassShipped
KT26-15758C23.97 V90.3%32 mVPassShipped
KT26-15759C24.00 V90.6%33 mVPassShipped
KT26-15760C24.02 V91.5%41 mVRepairedShipped
KT26-15761C24.02 V90.7%52 mVPassShipped
KT26-15762C24.05 V92.7%19 mVPassShipped
KT26-15763C24.05 V93.4%38 mVPassShipped
KT26-15764C24.03 V92.7%40 mVPassShipped
KT26-15765C24.02 V91.7%18 mVPassShipped
KT26-15766C24.04 V91.9%45 mVPassShipped
KT26-15767C23.99 V93%19 mVPassShipped
KT26-15768C24.01 V90.4%45 mVRepairedShipped
KT26-15769C24.04 V93.2%50 mVPassShipped
KT26-15770C24.02 V91.2%29 mVPassShipped
KT26-15771C24.00 V91.8%46 mVPassShipped
KT26-15772C23.98 V91.1%47 mVPassShipped
Works order
Builds
GBP2150R-72-24
Quantity
24 · 24 built
Stage
Complete
For
SO-26-0288
TrackSafe Monitoring
Released
28 Aug 2026
Due
21 Sep 2026
Completed
16 Sep 2026
Assigned
Andrew Costa
Build time
24 h (60 min each)
Std cost
$633.35 each · $15,200.40
Build documentsAll →
DWG-GBP2150R-72-24
Assembly drawing
C Released
BOM-GBP2150R-72-24
Bill of materials
C Released
TP-GBP2150R-72-24
Test procedure
B Released