Kit list — BOM rev D × 19Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CTL-GBP2 sub-assy Control PCBA, GBP2 / GBP2-R | K3-05 | 1 ea | 19 | 26 | Issued |
| ENC-GBP2 sub-assy Enclosure kit, GBP2 | K5-08 | 1 ea | 19 | 39 | Issued |
| HAR-GBP2 sub-assy Output harness, GBP2 | K4-02 | 1 ea | 19 | 41 | Issued |
| PSA-P240 sub-assy Power stage PCBA, GBP2 240W | K2-02 | 1 ea | 19 | 10 | Issued |
| J-PC5-4 Terminal block 4-pos 5.08mm | D2-02 | 1 ea | 19 | 326 | Issued |
| P-CTN-M Carton medium, printed | H1-02 | 1 ea | 19 | 482 | Issued |
| P-FOAM Foam insert, die cut | H1-04 | 1 ea | 19 | 424 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 19 | 247 | Issued |
Serials & test records (19)All →
First unit KT26-15918 · tested by Tom Barker on 28 Oct 2026
Input
48 VDC
Output @ 100%
23.98 V
Efficiency
91%
Ripple
36 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15918 | D | 23.98 V | 91% | 36 mV | Pass | Shipped |
| KT26-15919 | D | 23.99 V | 91.6% | 38 mV | Repaired | Shipped |
| KT26-15920 | D | 24.01 V | 90.2% | 59 mV | Pass | Shipped |
| KT26-15921 | D | 23.99 V | 92.9% | 18 mV | Pass | Shipped |
| KT26-15922 | D | 24.01 V | 91.1% | 54 mV | Pass | Shipped |
| KT26-15923 | D | 24.04 V | 92.7% | 22 mV | Pass | Shipped |
| KT26-15924 | D | 24.04 V | 90.7% | 21 mV | Pass | Shipped |
| KT26-15925 | D | 24.04 V | 90.7% | 57 mV | Pass | Shipped |
| KT26-15926 | D | 24.04 V | 90.7% | 50 mV | Pass | Shipped |
| KT26-15927 | D | 23.98 V | 92.9% | 23 mV | Pass | Shipped |
| KT26-15928 | D | 24.02 V | 90.5% | 19 mV | Repaired | Shipped |
| KT26-15929 | D | 23.97 V | 90.5% | 32 mV | Pass | Shipped |
| KT26-15930 | D | 24.00 V | 90.7% | 22 mV | Repaired | Shipped |
| KT26-15931 | D | 24.03 V | 93.3% | 33 mV | Pass | Shipped |
| KT26-15932 | D | 24.02 V | 91% | 60 mV | Pass | Shipped |
| KT26-15933 | D | 24.04 V | 91.7% | 49 mV | Pass | Shipped |
| KT26-15934 | D | 24.01 V | 90.2% | 26 mV | Pass | Shipped |
| KT26-15935 | D | 24.04 V | 90.6% | 56 mV | Pass | Shipped |
| KT26-15936 | D | 23.98 V | 93.5% | 22 mV | Pass | Shipped |
Works order
- Builds
- GBP2240-48-24
- Quantity
- 19 · 19 built
- Stage
- Complete
- For
- SO-26-0299Trident Fleet Electrics
- Released
- 06 Oct 2026
- Due
- 02 Nov 2026
- Completed
- 28 Oct 2026
- Assigned
- Hassan Ali
- Build time
- 11.1 h (35 min each)
- Std cost
- $437.43 each · $8,311.17
Build documentsAll →
DWG-GBP2240-48-24
Assembly drawing
D ReleasedBOM-GBP2240-48-24
Bill of materials
D ReleasedTP-GBP2240-48-24
Test procedure
C Released