KaRaTec

WO-26-1333

GBP2150R-72-24 ×6 — GBP2-R rail DC/DC converter 72V → 24V, 150W
MYOB · synced 08:55 Demo 03 Nov 2026
PlannedKittedPCB assemblyFinal assemblyBurn-in & testQC & packComplete
Rev C Traveller
Kit list — BOM rev C × 6Issued from stock
PartBinPer unitNeededOn hand
CTL-GBP2 sub-assy
Control PCBA, GBP2 / GBP2-R
K3-051 ea626Issued
ENC-RAIL sub-assy
Enclosure kit, rail IP66
K5-081 ea620Issued
FLT-RAIL sub-assy
Input filter PCBA, EN50155
K3-041 ea621Issued
PSA-P240 sub-assy
Power stage PCBA, GBP2 240W
K2-021 ea610Issued
J-M12-4
M12 4-pin panel connector
D2-041 ea678Issued
J-M12-8
M12 8-pin A-coded panel connector
D2-031 ea626Issued
P-CTN-L
Carton large, printed
H1-031 ea6150Issued
P-FOAM
Foam insert, die cut
H1-041 ea6424Issued
P-GUIDE
Installation guide, printed
H1-051 ea6247Issued
Serials & test records (6)All →
First unit KT26-16029 · tested by Josh Mitchell on 02 Nov 2026
Input
72 VDC
Output @ 100%
23.98 V
Efficiency
92.4%
Ripple
46 mV
Burn-in
48 h
Result
Pass
SerialRevVoutEff.RippleResultStatus
KT26-16029C23.98 V92.4%46 mVPassIn stock
KT26-16030C24.01 V92.1%33 mVPassIn stock
KT26-16031C24.03 V92.3%29 mVPassIn stock
KT26-16032C23.98 V90.1%61 mVPassIn stock
KT26-16033C23.98 V93.4%33 mVPassIn stock
KT26-16034C23.96 V90.2%37 mVPassIn stock
Works order
Builds
GBP2150R-72-24
Quantity
6 · 6 built
Stage
Complete
For
SO-26-0317
TrackSafe Monitoring
Released
07 Oct 2026
Due
29 Oct 2026
Completed
02 Nov 2026
Assigned
Hassan Ali
Build time
6 h (60 min each)
Std cost
$633.35 each · $3,800.10
Build documentsAll →
DWG-GBP2150R-72-24
Assembly drawing
C Released
BOM-GBP2150R-72-24
Bill of materials
C Released
TP-GBP2150R-72-24
Test procedure
B Released