KaRaTec

PSA-GS120

Power stage PCBA, GS 120W
MYOB · synced 08:55 Demo 03 Nov 2026
On hand
43 ea
Bin K2-01
Allocated
39
open orders & unkitted builds
In build
24
Std cost
$132.68
rolled up from 2 BOM levels
Bill of materials — rev C, all levelsBOM-PSA-GS120 →
PartLevelPerExt. qtyOn handUnit costExt. cost
PCB-GS120
Bare PCB GS 120W power, 4L
L1 1 ea149 $9.40$9.40
Q-IRFB4110
MOSFET 100V 180A TO-220
L1 2 ea2179 $5.45$10.90
D-STPS30H100
Schottky diode 100V 30A TO-220
L1 2 ea2180 $1.85$3.70
MAG-T120 rev C
Main transformer 120W, ETD29
L1 1 ea113 $39.24$39.24
└ M-ETD29
Ferrite core pair ETD29 N87
L2 1 ea157 $2.10$2.10
└ M-BOB29
Bobbin ETD29 13-pin
L2 1 ea176 $0.70$0.70
└ M-WIRE08
Enamelled copper wire 0.8mm
L2 9 m91,032 $0.09$0.81
└ M-LITZ100
Litz wire 100 × 0.1mm
L2 2 m2168 $0.85$1.70
└ M-TAPE
Polyester insulation tape 25mm
L2 1 m1337 $0.06$0.06
C-ELC470-63
Electrolytic 470µF 63V 105°C
L1 3 ea3354 $0.95$2.85
C-MLCC10U-100
MLCC 10µF 100V X7R 1210
L1 4 ea4453 $0.42$1.68
C-FILM2U2-250
Film capacitor 2.2µF 275VAC X2
L1 1 ea1195 $1.20$1.20
R-0603
Resistor 0603 1% (per placement)
L1 36 ea3612,000 $0.01$0.36
C-MLCC100N-50
MLCC 100nF 50V X7R 0603
L1 22 ea227,711 $0.01$0.22
H-TPAD
Thermal pad TO-220, silicone
L1 4 ea4858 $0.18$0.72
H-CLIP220
TO-220 heatsink spring clip
L1 4 ea4599 $0.35$1.40
Materials (level 1) $71.67Labour 38 min $43.70Overhead 15% $17.31Std cost $132.68
Direct BOM lines (edit)
PartQty perRef des
MAG-T120 Main transformer 120W, ETD29
C-ELC470-63 Electrolytic 470µF 63V 105°C
C-FILM2U2-250 Film capacitor 2.2µF 275VAC X2
C-MLCC100N-50 MLCC 100nF 50V X7R 0603
C-MLCC10U-100 MLCC 10µF 100V X7R 1210
D-STPS30H100 Schottky diode 100V 30A TO-220
H-CLIP220 TO-220 heatsink spring clip
H-TPAD Thermal pad TO-220, silicone
PCB-GS120 Bare PCB GS 120W power, 4L
Q-IRFB4110 MOSFET 100V 180A TO-220
R-0603 Resistor 0603 1% (per placement)
Stock historylast 25 movements
WhenMovementRefQtyNote
16 Oct 2026 · 08:30Issued to WOWO-26-1304-20PSA-GS120
14 Oct 2026 · 15:00BuiltWO-26-1305+20Completed and booked in
12 Oct 2026 · 08:30Issued to WOWO-26-1334-15PSA-GS120
09 Oct 2026 · 08:30Issued to WOWO-26-1329-12PSA-GS120
06 Jul 2026 · 07:30StocktakeST-2026-07+70Quarterly count
Part
Level
Sub-assembly
Category
Power stage PCBA
Revision
C
Lead time
5 days
Reorder
Made / bought to order