On hand
18 ea
Bin FG-08
Allocated
36
open orders & unkitted builds
In build
39
Std cost
$461.55
rolled up from 3 BOM levels
Sell ex GST
$970.00
52.4% gross margin
Bill of materials — rev B, all levelsBOM-GS120-24 →
| Part | Level | Per | Ext. qty | On hand | Unit cost | Ext. cost |
|---|---|---|---|---|---|---|
| PSA-GS120 rev C | L1 | 1 ea | 1 | 43 | $132.68 | $132.68 |
| └ PCB-GS120 | L2 | 1 ea | 1 | 49 | $9.40 | $9.40 |
| └ Q-IRFB4110 | L2 | 2 ea | 2 | 179 | $5.45 | $10.90 |
| └ D-STPS30H100 | L2 | 2 ea | 2 | 180 | $1.85 | $3.70 |
| └ MAG-T120 rev C | L2 | 1 ea | 1 | 13 | $39.24 | $39.24 |
| └ M-ETD29 | L3 | 1 ea | 1 | 57 | $2.10 | $2.10 |
| └ M-BOB29 | L3 | 1 ea | 1 | 76 | $0.70 | $0.70 |
| └ M-WIRE08 | L3 | 9 m | 9 | 1,032 | $0.09 | $0.81 |
| └ M-LITZ100 | L3 | 2 m | 2 | 168 | $0.85 | $1.70 |
| └ M-TAPE | L3 | 1 m | 1 | 337 | $0.06 | $0.06 |
| └ C-ELC470-63 | L2 | 3 ea | 3 | 354 | $0.95 | $2.85 |
| └ C-MLCC10U-100 | L2 | 4 ea | 4 | 453 | $0.42 | $1.68 |
| └ C-FILM2U2-250 | L2 | 1 ea | 1 | 195 | $1.20 | $1.20 |
| └ R-0603 | L2 | 36 ea | 36 | 12,000 | $0.01 | $0.36 |
| └ C-MLCC100N-50 | L2 | 22 ea | 22 | 7,711 | $0.01 | $0.22 |
| └ H-TPAD | L2 | 4 ea | 4 | 858 | $0.18 | $0.72 |
| └ H-CLIP220 | L2 | 4 ea | 4 | 599 | $0.35 | $1.40 |
| CHG-GS rev C | L1 | 1 ea | 1 | 65 | $89.37 | $89.37 |
| └ PCB-GSCHG | L2 | 1 ea | 1 | 80 | $7.60 | $7.60 |
| └ U-BQ24610 | L2 | 1 ea | 1 | 6 | $6.40 | $6.40 |
| └ U-STM32G031 | L2 | 1 ea | 1 | 220 | $2.45 | $2.45 |
| └ U-LM5122 | L2 | 1 ea | 1 | 56 | $5.20 | $5.20 |
| └ Q-BSC093N15 | L2 | 2 ea | 2 | 320 | $4.10 | $8.20 |
| └ L-IND10U | L2 | 1 ea | 1 | 129 | $1.20 | $1.20 |
| └ R-SHUNT5M | L2 | 1 ea | 1 | 124 | $0.64 | $0.64 |
| └ R-NTC10K | L2 | 1 ea | 1 | 89 | $0.35 | $0.35 |
| └ R-0603 | L2 | 48 ea | 48 | 12,000 | $0.01 | $0.48 |
| └ C-MLCC100N-50 | L2 | 30 ea | 30 | 7,711 | $0.01 | $0.30 |
| └ C-MLCC10U-100 | L2 | 4 ea | 4 | 453 | $0.42 | $1.68 |
| └ U-PC817 | L2 | 2 ea | 2 | 1,170 | $0.18 | $0.36 |
| └ J-PC5-4 | L2 | 1 ea | 1 | 326 | $2.60 | $2.60 |
| HAR-GS rev B | L1 | 1 ea | 1 | 63 | $36.80 | $36.80 |
| └ W-10AWG | L2 | 1.5 m | 1.5 | 129 | $3.20 | $4.80 |
| └ J-SB50 | L2 | 1 ea | 1 | 51 | $6.90 | $6.90 |
| └ W-LUGM6 | L2 | 2 ea | 2 | 393 | $0.55 | $1.10 |
| └ W-HSHRINK | L2 | 0.4 m | 0.4 | 120 | $0.45 | $0.18 |
| └ F-ATO15 | L2 | 1 ea | 1 | 77 | $0.32 | $0.32 |
| └ F-HOLD-ATO | L2 | 1 ea | 1 | 75 | $1.45 | $1.45 |
| ENC-GS rev B | L1 | 1 ea | 1 | 62 | $82.05 | $82.05 |
| └ E-GSCAB | L2 | 1 ea | 1 | 42 | $36.50 | $36.50 |
| └ E-GSBRKT | L2 | 1 ea | 1 | 32 | $9.80 | $9.80 |
| └ H-GLAND20 | L2 | 2 ea | 2 | 114 | $1.65 | $3.30 |
| └ H-M4X10 | L2 | 10 ea | 10 | 1,313 | $0.06 | $0.60 |
| └ H-LABEL | L2 | 1 ea | 1 | 160 | $0.45 | $0.45 |
| J-PC5-4 | L1 | 2 ea | 2 | 326 | $2.60 | $5.20 |
| P-CTN-L | L1 | 1 ea | 1 | 150 | $2.90 | $2.90 |
| P-GUIDE | L1 | 1 ea | 1 | 247 | $0.60 | $0.60 |
Materials (level 1) $349.60Labour 45 min $51.75Overhead 15% $60.20Std cost $461.55
Direct BOM lines (edit)
Stock historylast 25 movements
| When | Movement | Ref | Qty | Note |
|---|---|---|---|---|
| 12 Oct 2026 · 15:30 | Built | WO-26-1329 | +12 | Completed and booked in |
| 06 Jul 2026 · 07:30 | Stocktake | ST-2026-07 | +6 | Quarterly count |
Part
- Level
- Finished
- Category
- Battery backup PSU
- Family
- GS InCharge
- Revision
- B
- Lead time
- 15 days
- Reorder
- at 6, order 15
- Spec
- 230VAC in, 24V load + bi-directional battery output, 120W, 3-step temp-compensated charge, battery monitoring
Where used (0)
Top-level product.