WO-26-1259

GS120-12 ×4 — InCharge GS battery backup PSU 12V, 120W
MYOB · synced 08:55 Demo 03 Nov 2026
PlannedKittedPCB assemblyFinal assemblyBurn-in & testQC & packComplete
Rev B Traveller
Kit list — BOM rev B × 4Issued from stock
PartBinPer unitNeededOn hand
CHG-GS sub-assy
Charger & battery monitor PCBA, GS
K3-031 ea465Issued
ENC-GS sub-assy
Enclosure kit, GS wall-mount
K5-021 ea462Issued
HAR-GS sub-assy
Battery lead set, GS (SB50)
K4-041 ea463Issued
PSA-GS120 sub-assy
Power stage PCBA, GS 120W
K2-011 ea443Issued
J-PC5-4
Terminal block 4-pos 5.08mm
D2-022 ea8326Issued
P-CTN-L
Carton large, printed
H1-031 ea4150Issued
P-GUIDE
Installation guide, printed
H1-051 ea4247Issued
Serials & test records (4)All →
First unit KT26-15289 · tested by Tom Barker on 03 Aug 2026
Input
12 VDC
Output @ 100%
11.98 V
Efficiency
90.4%
Ripple
55 mV
Burn-in
24 h
Result
Pass
SerialRevVoutEff.RippleResultStatus
KT26-15289B11.98 V90.4%55 mVPassShipped
KT26-15290B12.01 V91.1%44 mVPassShipped
KT26-15291B11.99 V93.4%28 mVPassShipped
KT26-15292B11.99 V91.5%56 mVPassShipped
Works order
Builds
GS120-12
Quantity
4 · 4 built
Stage
Complete
For
SO-26-0276
Tasman Energy Networks
Released
10 Jul 2026
Due
03 Aug 2026
Completed
03 Aug 2026
Assigned
Andrew Costa
Build time
3 h (45 min each)
Std cost
$461.55 each · $1,846.20
Build documentsAll →
DWG-GS120-12
Assembly drawing
B Released
BOM-GS120-12
Bill of materials
B Released
TP-GS120-12
Test procedure
A Released