Kit list — BOM rev E × 14Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CHG-GS sub-assy Charger & battery monitor PCBA, GS | K3-03 | 1 ea | 14 | 65 | Issued |
| ENC-GS sub-assy Enclosure kit, GS wall-mount | K5-02 | 1 ea | 14 | 62 | Issued |
| HAR-GS sub-assy Battery lead set, GS (SB50) | K4-04 | 1 ea | 14 | 63 | Issued |
| PSA-GS300 sub-assy Power stage PCBA, GS 300W | K2-09 | 1 ea | 14 | 19 | Issued |
| J-PC5-4 Terminal block 4-pos 5.08mm | D2-02 | 2 ea | 28 | 326 | Issued |
| P-CTN-L Carton large, printed | H1-03 | 1 ea | 14 | 150 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 14 | 247 | Issued |
Serials & test records (14)All →
First unit KT26-15498 · tested by Josh Mitchell on 22 Sep 2026
Input
24 VDC
Output @ 100%
23.99 V
Efficiency
92.9%
Ripple
32 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-15498 | E | 23.99 V | 92.9% | 32 mV | Pass | Shipped |
| KT26-15499 | E | 23.98 V | 93.3% | 61 mV | Repaired | Shipped |
| KT26-15500 | E | 23.95 V | 92.7% | 56 mV | Pass | Shipped |
| KT26-15501 | E | 24.03 V | 90.8% | 21 mV | Pass | Shipped |
| KT26-15502 | E | 24.02 V | 93.1% | 47 mV | Pass | Shipped |
| KT26-15503 | E | 24.04 V | 93.4% | 32 mV | Pass | Shipped |
| KT26-15504 | E | 23.98 V | 93.2% | 21 mV | Pass | Shipped |
| KT26-15505 | E | 24.03 V | 93% | 47 mV | Pass | Shipped |
| KT26-15506 | E | 24.03 V | 91.8% | 19 mV | Pass | Shipped |
| KT26-15507 | E | 23.96 V | 92.7% | 35 mV | Pass | Shipped |
| KT26-15508 | E | 23.98 V | 90.9% | 53 mV | Pass | Shipped |
| KT26-15509 | E | 23.99 V | 91.6% | 54 mV | Pass | Shipped |
| KT26-15510 | E | 24.01 V | 91.6% | 36 mV | Pass | Shipped |
| KT26-15511 | E | 24.01 V | 91.8% | 39 mV | Pass | Shipped |
Works order
- Builds
- GS300-24
- Quantity
- 14 · 14 built
- Stage
- Complete
- For
- SO-26-0282Citadel Integrated Systems
- Released
- 24 Aug 2026
- Due
- 23 Sep 2026
- Completed
- 22 Sep 2026
- Assigned
- Linh Nguyen
- Build time
- 10.5 h (45 min each)
- Std cost
- $563.96 each · $7,895.44
Build documentsAll →
DWG-GS300-24
Assembly drawing
E ReleasedBOM-GS300-24
Bill of materials
E ReleasedCERT-RCM-GS
Compliance certificate
C ReleasedTP-GS300-24
Test procedure
D Released