KaRaTec

WO-26-1303

PSA-GS300 ×14 — Power stage PCBA, GS 300W
MYOB · synced 08:55 Demo 03 Nov 2026
PlannedKittedPCB assemblyFinal assemblyBurn-in & testQC & packComplete
Rev C Traveller
Kit list — BOM rev C × 14Issued from stock
PartBinPer unitNeededOn hand
MAG-T360 sub-assy
Main transformer 360W, ETD49
K1-081 ea1419Issued
C-ELC220-160
Electrolytic 220µF 160V 105°C
B1-023 ea42206Issued
C-ELC470-63
Electrolytic 470µF 63V 105°C
B1-012 ea28354Issued
C-FILM2U2-250
Film capacitor 2.2µF 275VAC X2
B1-062 ea28195Issued
C-MLCC100N-50
MLCC 100nF 50V X7R 0603
B1-0526 ea3647,711Issued
C-MLCC10U-100
MLCC 10µF 100V X7R 1210
B1-046 ea84453Issued
D-VS60EPU02
Ultrafast diode 200V 60A TO-247
A1-062 ea2875Issued
H-CLIP220
TO-220 heatsink spring clip
G1-056 ea84599Issued
H-TPAD
Thermal pad TO-220, silicone
G1-046 ea84858Issued
L-IND33U
Power inductor 33µH 15A
C2-041 ea1498Issued
PCB-GS300
Bare PCB GS 300W power, 4L 2oz
E1-101 ea1441Issued
Q-IPP60R099
MOSFET 600V 31A TO-220
A1-012 ea2830Issued
R-0603
Resistor 0603 1% (per placement)
B2-0144 ea61612,000Issued
R-SHUNT5M
Current shunt 5mΩ 3W 2512
B2-021 ea14124Issued
Serials & test records (0)
Sub-assemblies are booked into stock without serials.
Works order
Builds
PSA-GS300
Quantity
14 · 14 built
Stage
Complete
For
SO-26-0302
Northgate Security Integration
Feeds
WO-26-1302
Released
13 Oct 2026
Due
02 Nov 2026
Completed
14 Oct 2026
Assigned
Linh Nguyen
Build time
12.8 h (55 min each)
Std cost
$221.73 each · $3,104.22
Build documentsAll →
BOM-PSA-GS300
Bill of materials
C Released