Kit list — BOM rev E × 10Not kitted yet
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CHG-GS sub-assy Charger & battery monitor PCBA, GS | K3-03 | 1 ea | 10 | 65 | OK |
| ENC-GS sub-assy Enclosure kit, GS wall-mount | K5-02 | 1 ea | 10 | 62 | OK |
| HAR-GS sub-assy Battery lead set, GS (SB50) | K4-04 | 1 ea | 10 | 63 | OK |
| PSA-GS300 sub-assy Power stage PCBA, GS 300W | K2-09 | 1 ea | 10 | 19 | OK |
| J-PC5-4 Terminal block 4-pos 5.08mm | D2-02 | 2 ea | 20 | 326 | OK |
| P-CTN-L Carton large, printed | H1-03 | 1 ea | 10 | 150 | OK |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 10 | 247 | OK |
Serials & test records (0)
Serial numbers are minted when the build is completed, each with its burn-in and test record.
Works order
- Builds
- GS300-24
- Quantity
- 10
- Stage
- Planned
- For
- SO-26-0313GridEdge Utilities
- Released
- 05 Nov 2026
- Due
- 03 Dec 2026
- Assigned
- Andrew Costa
- Build time
- 7.5 h (45 min each)
- Std cost
- $563.96 each · $5,639.60
Sub-assembly works orders
WO-26-1328 PSA-GS300 ×10PCB assemblyBuild documentsAll →
DWG-GS300-24
Assembly drawing
E ReleasedBOM-GS300-24
Bill of materials
E ReleasedCERT-RCM-GS
Compliance certificate
C ReleasedTP-GS300-24
Test procedure
D Released