Kit list — BOM rev B × 15Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CHG-GS sub-assy Charger & battery monitor PCBA, GS | K3-03 | 1 ea | 15 | 65 | Issued |
| ENC-GS sub-assy Enclosure kit, GS wall-mount | K5-02 | 1 ea | 15 | 62 | Issued |
| HAR-GS sub-assy Battery lead set, GS (SB50) | K4-04 | 1 ea | 15 | 63 | Issued |
| PSA-GS120 sub-assy Power stage PCBA, GS 120W | K2-01 | 1 ea | 15 | 43 | Issued |
| J-PC5-4 Terminal block 4-pos 5.08mm | D2-02 | 2 ea | 30 | 326 | Issued |
| P-CTN-L Carton large, printed | H1-03 | 1 ea | 15 | 150 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 15 | 247 | Issued |
Serials & test records (15)All →
First unit KT26-16035 · tested by Josh Mitchell on 26 Oct 2026
Input
12 VDC
Output @ 100%
11.99 V
Efficiency
90.1%
Ripple
47 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-16035 | B | 11.99 V | 90.1% | 47 mV | Pass | Shipped |
| KT26-16036 | B | 11.99 V | 90.9% | 55 mV | Pass | Shipped |
| KT26-16037 | B | 11.99 V | 91.6% | 23 mV | Pass | Shipped |
| KT26-16038 | B | 12.01 V | 92.1% | 42 mV | Pass | Shipped |
| KT26-16039 | B | 12.00 V | 91.8% | 54 mV | Pass | Shipped |
| KT26-16040 | B | 11.99 V | 91.3% | 42 mV | Pass | Shipped |
| KT26-16041 | B | 12.02 V | 91.9% | 48 mV | Pass | Shipped |
| KT26-16042 | B | 11.99 V | 93.4% | 33 mV | Pass | Shipped |
| KT26-16043 | B | 12.00 V | 91.2% | 25 mV | Pass | Shipped |
| KT26-16044 | B | 12.02 V | 92.8% | 39 mV | Pass | Shipped |
| KT26-16045 | B | 12.01 V | 92.1% | 27 mV | Pass | Shipped |
| KT26-16046 | B | 12.01 V | 90.1% | 22 mV | Pass | Shipped |
| KT26-16047 | B | 11.99 V | 91.4% | 19 mV | Pass | Shipped |
| KT26-16048 | B | 12.02 V | 90.4% | 52 mV | Pass | Shipped |
| KT26-16049 | B | 11.98 V | 91.3% | 22 mV | Pass | Shipped |
Works order
- Builds
- GS120-12
- Quantity
- 15 · 15 built
- Stage
- Complete
- For
- SO-26-0318Citadel Integrated Systems
- Released
- 09 Oct 2026
- Due
- 26 Oct 2026
- Completed
- 26 Oct 2026
- Assigned
- Grace O'Brien
- Build time
- 11.3 h (45 min each)
- Std cost
- $461.55 each · $6,923.25
Build documentsAll →
DWG-GS120-12
Assembly drawing
B ReleasedBOM-GS120-12
Bill of materials
B ReleasedTP-GS120-12
Test procedure
A Released