Kit list — BOM rev C × 6Issued from stock
| Part | Bin | Per unit | Needed | On hand | |
|---|---|---|---|---|---|
| CHG-GS sub-assy Charger & battery monitor PCBA, GS | K3-03 | 1 ea | 6 | 65 | Issued |
| ENC-GS sub-assy Enclosure kit, GS wall-mount | K5-02 | 1 ea | 6 | 62 | Issued |
| HAR-GS sub-assy Battery lead set, GS (SB50) | K4-04 | 1 ea | 6 | 63 | Issued |
| PSA-GS300 sub-assy Power stage PCBA, GS 300W | K2-09 | 1 ea | 6 | 19 | Issued |
| J-PC5-4 Terminal block 4-pos 5.08mm | D2-02 | 2 ea | 12 | 326 | Issued |
| P-CTN-L Carton large, printed | H1-03 | 1 ea | 6 | 150 | Issued |
| P-GUIDE Installation guide, printed | H1-05 | 1 ea | 6 | 247 | Issued |
Serials & test records (6)All →
First unit KT26-16164 · tested by Tom Barker on 30 Oct 2026
Input
48 VDC
Output @ 100%
48.06 V
Efficiency
90.9%
Ripple
39 mV
Burn-in
24 h
Result
Pass
| Serial | Rev | Vout | Eff. | Ripple | Result | Status |
|---|---|---|---|---|---|---|
| KT26-16164 | C | 48.06 V | 90.9% | 39 mV | Pass | Shipped |
| KT26-16165 | C | 47.92 V | 91.4% | 61 mV | Pass | Shipped |
| KT26-16166 | C | 48.06 V | 92.9% | 55 mV | Pass | Shipped |
| KT26-16167 | C | 48.06 V | 93% | 58 mV | Pass | Shipped |
| KT26-16168 | C | 48.03 V | 92.7% | 21 mV | Pass | Shipped |
| KT26-16169 | C | 47.91 V | 91.6% | 26 mV | Pass | Shipped |
Works order
- Builds
- GS300-48
- Quantity
- 6 · 6 built
- Stage
- Complete
- For
- SO-26-0320Summit Data Centres
- Released
- 12 Oct 2026
- Due
- 26 Oct 2026
- Completed
- 30 Oct 2026
- Assigned
- Andrew Costa
- Build time
- 4.5 h (45 min each)
- Std cost
- $563.96 each · $3,383.76
Build documentsAll →
DWG-GS300-48
Assembly drawing
C ReleasedBOM-GS300-48
Bill of materials
C ReleasedTP-GS300-48
Test procedure
B Released